RECEIVING AND POSITIONING
25
Receiving
Positioning
Check on receiving
As soon as the unit is received verify accurately the corre-
spondance of the load to what was ordered to make sure that
all the material has been delivered. Check carefully that the
load has not been damaged. In case of goods with visible
damages inform promptly the haulage contractor reporting on
the delivery note the phrase “
Collected with reserves owing
to evident damage
”. Delivery ex works implies reimburse-
ment of any damage on charge of the insurance company as
established by law.
Safety instructions
Observe the safety regulations in force concerning the equip-
ment to use for unit handling or the operating formalities to fol-
low.
Handling
Before handling the unit, check the weight of the unit , repor-
ted both on the dataplate and on the technical documentation.
Make sure the unit to be handled with care avoiding any kind
of collision that could damage the operating parts of the unit.
On the packaging of the unit are reported all the instructions
necessary for a corect handling during storing and installation.
The unit is supplied on a pallet suitable for the transport. It is
advisable to place protective material between the truck and
the unit to avoid damages to the unit. Prevent the unit or parts
of it from falling down.
Storing
The units must be stored in a dry place, repaired from sun,
rain, sand or wind.
Do not stack the units.
Maximum temperature
=
60 °C
Minimum temperature
= -20 °C
Humidity
=
90 %
Packaging removal
Remove the packaging taking care not to damage the unit.
Check for any visible damage.
Get rid of the packaging material sending them to speciali-
zed recycling centres (observe the regulations in force).
The units are suitable for indoor installation.
Verify that the support surface can bear the weight of the
selected unit and is perfectly horizontal. In order to limit the
vibrations transmitted by the unit it is possible to place, bet-
ween the unit base and the support surface, a strip of hard
rubber or, if a higher level of insulation is required, vibration
dampers.
In any case it is not advisable to place the unit near private
offices, bedrooms or zones where very low noise levels are
required.
Respect the minimum operating area and verify that the instal-
lation place is not subject to flooding.
Содержание HSW 11.1
Страница 47: ...47...