33
At this time, the electronic control board will perform a
“ChEc”
test on the heater, during which it will carry out a range
of verifications. If the control board detects any anomaly, it will not start up and will instead give the corresponding error
message. If everything is correct, the heater will begin the process of starting up.
During the operation of the first starting up, ‘smoke’ may be seen to exit the heater inside the room
where it is installed, this is due to the solvents and varnishes in the paint drying out and will disappear
after a few hours.
It is recommended that you keep the room well ventilated during this time.
7.3. STATES OF OPERATION
7.3.1 LIGHTING
When the heater changes from being off to standby or operation, this stage is known as the lighting stage.
This stage can be subdivided into the following steps: Checking, Pre-heating, Pre-loading, Fixed lighting, Variable
lighting, and Stabilisation. During these stages, the user will be able to see the following messages on the upper
display:
7.3.2 HEATER DURING NORMAL OPERATION
The heater enters this stage when it has finished the entire process of lighting.
The time will appear on the upper display, and the operating power and room temperature on the lower display. The
upper LEDs will also indicate the elements that are operating, such as the room fan, the screw, and the ignition coil.
Содержание AROA 10
Страница 1: ...Quality of Life MANUAL FOR THE USER AND INSTALLATION AIR RANGE COD 0153 R2 INGL S...
Страница 2: ...2...
Страница 11: ...11 MODEL FLORA 7 8 kW MODEL NEREA 8 10 kW...
Страница 12: ...12 MODEL NATALIA 10 kW MODEL AROA 8 10 kW...
Страница 13: ...13 MODEL NEREA 12 15 kW MODEL LUNA 8 10 kW...
Страница 14: ...14 MODEL ESTELA 12 15 kW MODEL G NESIS 6 8 kW...
Страница 46: ...46...