1. Start the installation of the Alum Air Insulation from Level 1 and work your way down.
2. Install all panels on Level 1 before installing the level below.
3. Once level 1 is complete, move to Level 2. The top of Level 2 will overlap the bottom of Level 1. Pay
attention to the correct positioning of the panels - panels with ventilation openings need to be in line with
the vents in the dome cover.
4. Once complete, move to Level 3. Undo the bottom bolts from Level 2 and place the next layer of insulation
on top of the previously installed level 2. The top of level 3 will overlap the bottom of level 2. Pay attention
to the correct positioning of the panels - panels with porthole openings need to be in line with the
porthole openings in the dome cover.
5. Repeat the process until you finish with Level 5.
Alum-Air Insulation
Level 2
Level 3
Level 2
Level 3
Level 4
Level 5
Drawing 27
Alum Air Insulation Cross Section
- Dome without Skylight Window
Содержание GLAMPING 20
Страница 1: ...ASSEMBLY MANUAL GLAMPING 20 30 40 50...
Страница 2: ......
Страница 34: ...34 Map 1A CAMPING DOOR FG20 INSULATION P3 ENTRANCE...