background image

43

GLASS DOOR FG30/40/50 INSULATION LEVELS - P3 ENTRANCE

31

level 4.    7 elements

panoramic 

bay window

G30,40,50 alu door

level 5.    6 elements

level 3.    5 elements

level 2.    5 elements

level 1.    5 elements

panoramic 

bay window

door

door

GLASS DOOR FG30/40/50 INSULATION LEVELS - P3 ENTRANCE

Level 1. 

5 elements

Level 2 

5 elements

Level 3 

5 elements

Level 5.

6 elements

Panoramic 
bay window

Panoramic 
bay window

door

door

Level 4. 

7 elements

Map 5B

Содержание GLAMPING 20

Страница 1: ...ASSEMBLY MANUAL GLAMPING 20 30 40 50...

Страница 2: ......

Страница 3: ...AMPING DOOR ASSEMBLY MANUAL FG20 20 CAMPING DOOR ASSEMBLY MANUAL FG30 40 50 21 GLASS DOOR ALUMINUM DOOR FRAME ASSEMBLY MANUAL FG30 40 50 23 OUTER MEMBRANE TRANSPARENT FRONT ASSEMBLY GUIDE 26 PORTHOLE...

Страница 4: ...FOR M12 CONSTRUCTION S SCREWS 62 6 PCS M12 SCREW NUTS 62 6 PCS TO BUILD THE FG20 FG30 FG30 FG40 FG50 YOU WILL NEED 4 people a ladder of a minimum 4 m height a drill a 19 mm automatic wrench impact gu...

Страница 5: ...PPLIED COMPONENTS FOR THE OUTER MEMBRANE ASSEMBLY NAME OF THE ELEMENT QUANTITY PHOTO MEMBRANE 1 BUNGEE CORD 15 HOOKS FOR THE MEMBRANE AND METAL BANDS FG20 30 140 FG40 160 G50 190 TRANSPARENT FRONT 1 P...

Страница 6: ...A FRAME 1 AR PIPE FG20 30 40 50 1 AL PIPE FG30 40 50 80 1 BR PIPE FG20 30 40 50 1 BL PIPE FG20 30 40 50 1 CR PIPE FG20 30 40 50 1 CL PIPE FG20 30 40 50 1 DR PIPE FG20 30 40 50 1 DL PIPE FG20 30 40 50...

Страница 7: ...r or drive in a screw so that you know which spot to go back to when double checking your measurements GLAMPING FG20 R 2480 MM GLAMPING FG30 R 2965 MM GLAMPING FG40 R 3455 MM GLAMPING FG50 R 3950 MM M...

Страница 8: ...n Define the positions of the door and the transparent front window Radius of the dome Centre of the dome Mid Line of the dome P4 Entrance P3 Entrance Chalk line drawn on the platform dome perimeter T...

Страница 9: ...the previously drawn perimeter line Align the plates together with the foot push the bolt in from the outside From the inside place the washer first and the nut second Loosely screw on the nut NOTE Pl...

Страница 10: ...10 STEP 4 Double check the positioning and the radius Readjust the feet and metal bands STEP 5 Tighten the nuts on the bolts which you have just installed...

Страница 11: ...if ordered fix the feet to the deck concrete slab Pick two of four available holes and drive the screws into the deck concrete slabs two screws per one foot CONGRATULATIONS YOU ARE DONE WITH THE DOME...

Страница 12: ...n the diameter of your dome s footprint NOTE If you didn t purchase the Interior Modules steps 4 and 5 do not apply STEP 1 Unfold the PVC Ground membrane within the perimeter of the dome STEP 2 Positi...

Страница 13: ...her STEP 7 While standing on the inside of the dome s perimeter gently flip the excess membrane off the legs and base plates fully exposing them STEP 8 Peel the paper off from one side of the now conn...

Страница 14: ...it later if it can not be hidden and becomes a visual problem STEP 9 Peel the paper off from the other side of the velcro tape and glue the membrane right on NOTE There is no need to pull the membran...

Страница 15: ...15 FRAMEWORK ASSEMBLY MANUAL METAL BAND M ETAL BAND M ETAL BAND METAL BAND Drawing 4 Assembly diagram Overwiev Drawing 5 Dome framework map...

Страница 16: ...ds It will enable you to install the pipes which are necessary to build the fist level of the framework Drawing 7 Map of the dome s 1st level with the pipes markings The drawings below show a layout o...

Страница 17: ...el of the dome according to the map below Drawing 10 Map of the framework s 2nd level with the pipes markings Drawing 9 Finished knot view from the inside to the outside Drawing 8 Finished knot view f...

Страница 18: ...framework according to the map below Drawing 14 Map of the dome s 4th level with the pipes markings STEP 3 Build the third level of the framework according to the map below Drawing 11 Map of the frame...

Страница 19: ...STEP 5 Build the fith level of the framework according to the map below Drawing 15 Map of the dome s 5th level with the pipes markings CONGRATULATIONS YOU HAVE JUST FINISHED BUILDING THE DOME S FRAMEW...

Страница 20: ...on t worry It will all come back together once the doors are in place P3 P4 Drawing 16 Pipes to be removed STEP 2 Insert the door frame with the camping door and attach it to the framework using the p...

Страница 21: ...ace P3 P4 Drawing 18 Pipes to be removed STEP 2 Insert the door frame with the camping door and attach it to the framework using the pipes as presented in the drawings below The pipes are adjustable w...

Страница 22: ...screws to tighten the metal band to the door frame Drawing 20 FG40 Scheme of inserting the camping door into the FG40 dome s framework Drawing 21 FG50 Scheme of inserting the camping door into the FG5...

Страница 23: ...ct position of your doors P3 or P4 in line with your dome design P4 Door v2 P3 Door v1 Transparent Drawing 6 Possible door positions STEP 2 Remove the metal band indicated with the arrow and C C C C D...

Страница 24: ...ass Doors Installation Pack Position them on either side of the door opening left and right and attach them to the metal bands from the outside using the same bolts as before Contents of the pack 2x M...

Страница 25: ...the leveling of the doors by positioning the spirit level on top of the door wing You are able to adjust the position of the door frame as the pipes supplied M L K give you the room for adjustment on...

Страница 26: ...the D rings which are sawn into the membrane one rope per one D Ring The middle D Ring is directly opposite the space where the front window will be The remaining two are to the left and right side O...

Страница 27: ...just exchange the screws before you install the panoramic window as you risk scratching it if you decide to exchange them later on STEP 5 Attach the front panoramic window using velcro which is welde...

Страница 28: ...her one in each hole along the top edge of the metal bands Once these are in place weave the bungee cord between them which will secure the membrane from the inside of the dome NOTE Each bungee should...

Страница 29: ...SEMBLY MANUAL Put the circular window into one of the available window slots in the membrane The slots have two layers colars of membrane and all you need to do is put the window directly between thes...

Страница 30: ...k from the inside of the dome Please carefully pearce two holes for the bolts in the inner side of the membrane to fix the solar fan properly The holes should be located below the fan on its both side...

Страница 31: ...tion service or maintenance can cause injury or property damage For assistance or additional information consult an authorized technician The Stove and Chimney set is designed to be put on the same le...

Страница 32: ...100 cm CHIMNEY PIPE WITH FLASHING CHIMNEY PIPE WITH FLASHING CHIMNEY PIPE WITH FLASHING CHIMNEY PIPE WITH FLASHING L 50 cm L 100 cm L 100 cm L 50 cm L 100 cm L 37 cm L 50 cm ADAPTER ADAPTER ADAPTER AD...

Страница 33: ...map applies to both types of insulation Insulation and Standard AlumAir Insulation DOME TYPE PAGE NUMBER CAMPING DOOR FG20 P3 ENTRANCE 34 35 CAMPING DOOR FG20 P4 ENTRANCE 36 37 CAMPING DOOR FG30 40 50...

Страница 34: ...34 Map 1A CAMPING DOOR FG20 INSULATION P3 ENTRANCE...

Страница 35: ...door level 3 5 elements level 2 5 elements level 1 5 elements panoramic bay window panoramic bay window door door CAMPING DOOR FG20 INSULATION LEVELS P3 ENTRANCE Level 1 5 elements Level 2 5 elements...

Страница 36: ...2 5 3 5 4 5 5 Level 2 Level 3 Level 4 Level 5 5 elements 5 elements 5 elements 8 elements 7 elements CAMPING DOOR FG20 INSULATION P4 ENTRANCE 1 4 1 5 2 3 2 4 2 5 3 3 3 5 4 3 4 4 4 5 Level 1 building i...

Страница 37: ...vel 5 5 elements 5 elements 5 elements 8 elements 7 elements G20 camping door panoramic bay window door door GLASS DOOR FG20 INSULATION LEVELS P4 ENTRANCE Level 1 5 elements Level 2 5 elements Level 3...

Страница 38: ...1 2 2 2 3 2 3 2 4 2 5 3 1 3 2 3 3 3 4 3 5 4 2 4 3 4 4 4 5 4 8 4 9 4 10 4 11 5 1 Level 2 Level 3 Level 5 CAMPING DOOR FG30 40 50 INSULATION P3 ENTRANCE G30 40 50 camping door 1 1 1 2 1 3 1 4 1 5 4 1 4...

Страница 39: ...door level 5 9 elements level 4 11 elements level 3 5 elements level 2 5 elements level 1 5 elements door door CAMPING DOOR FG30 40 50 INSULATION LEVELS P3 ENTRANCE Level 1 5 elements Level 2 5 elemen...

Страница 40: ...8 4 9 5 1 5 2 5 3 5 6 5 7 5 7 5 8 Level 2 Level 3 Level 4 Level 5 5 elements 5 elements 9 elements CAMPING DOOR FG30 40 50 INSULATION P4 ENTRANCE 1 3 1 4 1 5 2 3 2 4 2 5 3 3 3 5 4 4 4 5 4 6 5 4 5 5 30...

Страница 41: ...G30 40 50 camping door level 4 11 elements level 3 5 elements level 2 5 elements level 1 5 elements door door CAMPING DOOR FG30 40 50 INSULATION LEVELS P4 ENTRANCE Level 1 5 elements Level 2 5 elemen...

Страница 42: ...ents 5 elements 5 elements 7 elements 6 elements We start building insulation from the first level GLASS DOOR FG30 40 50 INSULATION P3 ENTRANCE 1 1 1 2 1 3 1 4 1 5 2 1 2 2 2 3 2 4 2 5 G30 40 50 alu do...

Страница 43: ...r level 5 6 elements level 3 5 elements level 2 5 elements level 1 5 elements panoramic bay window door door GLASS DOOR FG30 40 50 INSULATION LEVELS P3 ENTRANCE Level 1 5 elements Level 2 5 elements L...

Страница 44: ...5 elements 5 elements 7 elements 6 elements We start building insulation from the first level GLASS DOOR FG30 40 50 INSULATION P4 ENTRANCE 1 1 1 2 1 3 1 4 1 5 2 1 2 2 2 3 2 4 2 5 3 1 3 2 3 3 3 5 4 1...

Страница 45: ...s level 4 7 elements level 3 5 elements level 2 5 elements level 1 5 elements panoramic bay window door door GLASS DOOR FG30 40 50 INSULATION LEVELS P4 ENTRANCE Level 1 5 elements Level 2 5 elements L...

Страница 46: ...ront transparent window have additional fabric flaps which will need to be folded inwards once the panels are installed The same apples to the flaps which are present along the top edge of Level 2 pan...

Страница 47: ...previously installed level 2 The top of level 3 will overlap the bottom of level 2 Pay attention to the correct positioning of the panels panels with porthole openings need to be in line with the port...

Страница 48: ...in line with the vents in the dome cover 4 Once complete move to Level 3 Undo the bottom bolts from Level 2 and place the next layer of insulation on top of the previously installed level 2 The top of...

Страница 49: ...layer of insulation on top of the previously installed level 2 The top of level 3 will overlap the bottom of level 2 Pay attention to the correct positioning of the panels panels with porthole opening...

Страница 50: ...enable Level 1 of the Alum Air insulation is to be installed at the end of the process Openable Alum Air Insulation layer Level 1 Level 2 Level 3 Level 4 Level 5 Level 2 Level 3 Level 4 Level 5 Insula...

Страница 51: ...ventilation openings need to be in line with the vents in the dome cover 3 Once complete move to Level 3 Undo the bottom bolts from Level 2 and place the next layer of insulation on top of the previou...

Страница 52: ...on top of the Insulation following the same map and installation order Level 2 Level 3 Level 4 Level 5 Level 2 Level 3 Level 4 Level 5 Insulation Alum Air Insulation Drawing 31 Insulation and Alum Ai...

Страница 53: ...let s keep in touch FDomes Team YOU ARE NOW READY TO EMBARK ON YOUR GLAMPING JOURNEY We would love to see the results of your work and how your project came together We are sure it is stunning Tag us...

Отзывы: