4
LIST OF THE SUPPLIED FOR THE STRUCTURE ASSEMBLY:
NAME OF THE COMPONENT
QUANTITY
PHOTO
A PIPE
30 PCS
B PIPE
40 PCS
C PIPE
70 PCS
D PIPE
10 PCS
METAL BAND
15 PCS
FOOT
15 PCS
M12/50 SCREWS FOR LEVEL 0 AND
FRONT TRANSPARENT WINDOW
18 PCS
WASHERS FOR M12 CONSTRUCTION’S
SCREWS
62+6 PCS
M12 SCREW NUTS
62+6 PCS
TO BUILD THE FG20, FG30, FG30, FG40, FG50 YOU WILL NEED:
•
4 people,
•
a ladder of a minimum 4 m height,
•
a drill,
•
a 19 mm automatic wrench (impact gun),
•
an 8mm and a 5 mm Allen key,
•
a hammer,
•
3 ropes - 15 - 20 m long each,
•
a protective ground sheet at least: 6 x 4 m
(to unfold the membrane onto, before pulling
it onto the metal framework. It will protect
the membrane from getting dirty on bare ground).
Содержание GLAMPING 20
Страница 1: ...ASSEMBLY MANUAL GLAMPING 20 30 40 50...
Страница 2: ......
Страница 34: ...34 Map 1A CAMPING DOOR FG20 INSULATION P3 ENTRANCE...