16
STEP 1
Build the fist level of the framework according to the map presented below. Remember to unscrew the nuts
of the screws connecting the feet with the metal bands. It will enable you to install the pipes which are
necessary to build the fist level of the framework.
Drawing 7
Map of the dome’s
1st level with the pipes’
markings
The drawings below show a layout of the framework and the possible positions of the door in relation
to the transparent front window.
P4
Door v2
P3
Door v1
Transparent
Drawing 6
Possible door positions
Содержание GLAMPING 20
Страница 1: ...ASSEMBLY MANUAL GLAMPING 20 30 40 50...
Страница 2: ......
Страница 34: ...34 Map 1A CAMPING DOOR FG20 INSULATION P3 ENTRANCE...