
33
F80W
OPERATING MANUAL
2.1.5 Screed operators' obligations
Before starting operation of the machine, screed operators are
obliged to get familiar with instructions stated in the documen-
tation supplied together with the machine, especially with safe-
ty precautions, and strictly observe the instructions. The same
also applies to personnel assigned to maintain, adjust and re-
pair the machine.
The operator must not operate the screed if he does not un-
derstand any part of the Operating manuals. Contact your local
dealer or the machine manufacturer.
The operator must not operate the screed unless he is fully fa-
miliarized with all functions, working and operating elements
and knows exactly how to operate the machine.
The screed operator is obliged to follow the safety and opera-
tion signs placed on the machine and keep them legible.
Before starting the work, the screed operators must get familiar
with the workplace environment, i.e. with obstructions, slopes,
utility line system, distribution lines of gas, potable water, pipe-
lines, sewerage, electrical and telephone lines, both aerial and
ground, and information about other potential obstacles.
If a screed operator finds out a hazard to health, danger to life
of people, property or failures during a breakdown of the tech-
nical equipment, and/or if he finds out indications of the above
mentioned during operation, he must interrupt the work and in
cooperation with the driver secure the machine against unwant-
ed start up, inform a responsible worker on the above mentioned
and if possible notify all people involved who might be endan-
gered.
Before starting operation of the machine, the screed operators
are obliged to get familiar with records and operational devia-
tions found during the previous work shift.
Before starting the work, the screed operator is obliged to in-
spect the machine and accessories, and to check control ele-
ments and communication and safety equipment for function-
ing according to the manual. When he finds a defect that might
endanger the safety of work and is not able to repair it, then he
must not put the machine into operation and must report the
defect to a responsible worker.
If the driver or the screed operator finds a defect during opera-
tion of the machine, he must park the machine in a safe area and
remove the defect.
During operation of the machine, the screed operator must fol-
low safety instructions and must not carry out any activity that
might endanger the safety of work; the screed operator must be
fully engaged in the operation of the screed.
The screed operator is obliged to comply with technological
procedures of works or instructions of a responsible worker.
After finishing the work with the machine, all of the defects,
damages to the machine and any repairs made must be record-
ed in the service book. When screed operators take turns, one
screed operator is obliged to report any identified facts to the
other screed operator.
The screed operators must use personal protective equipment,
work clothes, work boots, a warning vest, a protective helmet,
an ear protection and a dust protection mask.
During maintenance of the machine, lubrication and replace-
ment of operating fluids, hands must be protected with protec-
tive gloves and eyes with safety glasses or a safety shield.
The operator must carry out the machine maintenance in com-
pliance with instructions specified in the Operating manual.
The screed operator is obliged to equip the machine with acces-
sories and equipment as prescribed.
The screed operator is obliged to keep the driver’s stand, foot
rests and walkways clean.
The screed operator must keep the machine clean, free of oil
contaminants and inflammable materials.
Содержание Dynapac F80W
Страница 1: ...OPERATING MANUAL Asphalt paver wheeled F80W Hatz 4812217930 ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 14: ...8 F80W ...
Страница 15: ...9 F80W SPECIFICATION MANUAL 1 SPECIFICATION MANUAL F80W Hatz Tier 4 Final ...
Страница 18: ...12 F80W W1 W2 W W3 W4 B L L1 H H1 D451170A A L2 1 2 Dimensional drawing of the machine ...
Страница 23: ...17 F80W D451175 α 12 21 SPECIFICATION MANUAL Lateral static stability with an empty and full hopper ...
Страница 32: ...26 F80W Notes ...
Страница 33: ...27 F80W SPECIFICATION MANUAL Notes ...
Страница 34: ...28 F80W ...
Страница 35: ...29 F80W OPERATING MANUAL 2 OPERATING MANUAL F80W Hatz Tier 4 Final ...
Страница 62: ...56 F80W ...
Страница 79: ...73 F80W 451043 451044 D451042 OPERATING MANUAL Augers Screed Conveyor ...
Страница 123: ...117 F80W OPERATING MANUAL Notes ...
Страница 124: ...118 F80W ...
Страница 125: ...119 F80W MAINTENANCE MANUAL 3 MAINTENANCE MANUAL F80W Hatz Tier 4 Final ...
Страница 126: ...120 F80W ...
Страница 191: ...185 F80W 451190 MAINTENANCE MANUAL ...
Страница 193: ...187 F80W 451900 1 1 1 11 5 A 12 V 2 2 10 12 3 3 3 4 5 4 6 7 8 9 8 MAINTENANCE MANUAL ...
Страница 196: ...190 F80W 3 8 Appendices Notes ...
Страница 197: ......
Страница 198: ...www dynapac com ...