Protective equipment:
n
Working clothes
n
Protective gloves
1.
Park the machine in secured condition
„Parking the machine in secured condition“ on page 62
.
2.
Let the engine cool down to 20 °C (68 °F).
3.
Unscrew the fastening screws (1).
4.
Remove valve cover (2) with seal (3).
5.
Set the piston to the top dead centre position of the compres-
sion stroke.
For this purpose align the alignment mark (2) on the starter
disc to the top bore (1).
Valve clearance:
Intake valve (IN)
0.15 mm (0.006 in)
Exhaust valve (EX)
0.20 mm (0.008 in)
1.
Check the valve clearance with a feeler gauge between
rocker arm (2) and valve shaft (1) on both valves, adjust if
necessary.
Preparations
Fig. 65
Fig. 66
Checking the valve clearance
Fig. 67
Maintenance – Annually
BVP 10/36
81
Содержание BOMAG BVP 10/36
Страница 6: ...Table of contents BVP 10 36 6...
Страница 7: ...1 Introduction Introduction BVP 10 36 7...
Страница 11: ...2 Technical data Technical data BVP 10 36 11...
Страница 15: ...3 Concerning your safety Concerning your safety BVP 10 36 15...
Страница 38: ...Concerning your safety Signage BVP 10 36 38...
Страница 39: ...4 Indicators and control elements Indicators and control elements BVP 10 36 39...
Страница 45: ...5 Checks prior to start up Checks prior to start up BVP 10 36 45...
Страница 52: ...Checks prior to start up Checking the water level topping up BVP 10 36 52...
Страница 53: ...6 Operation Operation BVP 10 36 53...
Страница 64: ...Operation Parking the machine in secured condition BVP 10 36 64...
Страница 65: ...7 Loading transporting the machine Loading transporting the machine BVP 10 36 65...
Страница 69: ...8 Maintenance Maintenance BVP 10 36 69...
Страница 100: ...Maintenance As required BVP 10 36 100...
Страница 101: ...9 Troubleshooting Troubleshooting BVP 10 36 101...
Страница 107: ...10 Disposal Disposal BVP 10 36 107...
Страница 109: ...11 List of special tools List of special tools BVP 10 36 109...
Страница 111: ......