![Fayat BOMAG BVP 10/36 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/fayat/bomag-bvp-10-36/bomag-bvp-10-36_operating-instruction_3695675014.webp)
2.1 Noise and vibration data
The following noise and vibration data were determined in accord-
ance with the following guidelines under equipment specific condi-
tions and by using harmonized standards:
n
EU Machine Directive edition 2006/42/EU
n
Noise Emission Directive 2000/14/EU, Noise Protection Direc-
tive 2003/10/EU
n
Vibration Protection Directive 2002/44/EU
During operation these values may vary because of the prevailing
operating conditions.
2.1.1 Noise data
L
pA
= 91 dB(A), determined acc. to ISO 11201 and EN 500.
WARNING!
Loss of hearing caused by too high noise bur-
dens!
–
Wear your personal protective equipment (ear
protection).
L
WA
= 105 dB(A), determined acc. to ISO 3744 and EN 500
2.1.2 Vibration data
Vector total of the weighted effective acceleration in three orthog-
onal directions:
Total vibration value a
hv
= 4.4 m/s
2
on crushed rock determined
acc. to ISO 5349 and EN 500.
Associated uncertainty K
= 1.8 m/s
2
, determined acc. to EN
12096.
Observe the daily vibration load (work safety acc. to 2002/44/EC).
Vector total of the weighted effective acceleration in three orthog-
onal directions:
Total vibration value a
hv
£
2.5 m/s
2
on crushed rock determined
acc. to ISO 5349 and EN 500.
Associated uncertainty K
= 0.2 m/s
2
, determined acc. to EN
12096.
Observe the daily vibration load (work safety acc. to 2002/44/EC).
Sound pressure level at the opera-
tor's stand
Guaranteed sound power level
Hand-arm vibration
Hand-arm vibration with comfort
guide handle (optional equipment)
Technical data – Noise and vibration data
BVP 10/36
14
Содержание BOMAG BVP 10/36
Страница 6: ...Table of contents BVP 10 36 6...
Страница 7: ...1 Introduction Introduction BVP 10 36 7...
Страница 11: ...2 Technical data Technical data BVP 10 36 11...
Страница 15: ...3 Concerning your safety Concerning your safety BVP 10 36 15...
Страница 38: ...Concerning your safety Signage BVP 10 36 38...
Страница 39: ...4 Indicators and control elements Indicators and control elements BVP 10 36 39...
Страница 45: ...5 Checks prior to start up Checks prior to start up BVP 10 36 45...
Страница 52: ...Checks prior to start up Checking the water level topping up BVP 10 36 52...
Страница 53: ...6 Operation Operation BVP 10 36 53...
Страница 64: ...Operation Parking the machine in secured condition BVP 10 36 64...
Страница 65: ...7 Loading transporting the machine Loading transporting the machine BVP 10 36 65...
Страница 69: ...8 Maintenance Maintenance BVP 10 36 69...
Страница 100: ...Maintenance As required BVP 10 36 100...
Страница 101: ...9 Troubleshooting Troubleshooting BVP 10 36 101...
Страница 107: ...10 Disposal Disposal BVP 10 36 107...
Страница 109: ...11 List of special tools List of special tools BVP 10 36 109...
Страница 111: ......