Installation GA350
V.
1.0
22
4.1.3
Remove the transport brackets
1. Remove the screws (A).
2. Remove the transport brackets (B).
4.1.4
Dispose of the packaging material
1. Dispose of the packaging material in an environmentally
friendly way, according to local regulations.
4.2
Put the machine in position
4.2.1
Move the machine from the pallet
1. Place the optional ramp (A).
2. Push the machine from the pallet on to the ground.
4.2.2
Move the machine to the final location
13mm
4x
A
B
A
CAUTION
Do not use a fork-lift truck.
WARNING
Mind the minimal requirement of the building
structure of the load capacity of the floor. Refer
to
§ 6.2
.
Содержание GA350
Страница 1: ...V 1 0 www fast fluid com www fluidman com Manual GA350...
Страница 6: ...About this manual GA350 V 1 0 6...
Страница 10: ...Safety GA350 V 1 0 10...
Страница 24: ...Installation GA350 V 1 0 24...
Страница 30: ...Technical data GA350 V 1 0 30...