Installation GA350
V.
1.0
23
1. Push the machine to the final location.
2. Connect the power cable to the net entry.
3. Connect the power cable to the wall socket.
4.2.3
Level the machine
1. Move down the adjustable feet (B) until the wheels (A) are off
the ground.
2. Adjust the height of the feet and make sure that the machine
is leveled.
3. Tighten the nuts (C) to lock the feet.
4.3
Finish the installation
1. Turn on the machine. See
§ 3.2.1
.
CAUTION
Do not use a fork-lift truck.
Note
Make sure the final location is well-lit and well-
ventilated.
A
B
C
D
17mm
Содержание GA350
Страница 1: ...V 1 0 www fast fluid com www fluidman com Manual GA350...
Страница 6: ...About this manual GA350 V 1 0 6...
Страница 10: ...Safety GA350 V 1 0 10...
Страница 24: ...Installation GA350 V 1 0 24...
Страница 30: ...Technical data GA350 V 1 0 30...