a.
Agitation:
The front valve controls
the agitation circuit. Move
the handle at right angles
to the line to stop the
agitation. Move the handle
parallel to the line for
maximum agitation.
It is recommended that the
handle be set to provide
partial agitation to the
system during operation.
Provide higher rates of
agitation if using powders.
b.
Rinse:
The second valve controls
the tank rinse circuit.
Move the handle parallel to
the line to turn the tank
rinse or wash circuit on.
Move the handle at right
angles to the line to turn
the rinse circuit off.
c.
Rinse Tank Fill:
This valve controls the flow
of water into the front 100
gallon rinse tank. Move
the handle parallel to the
line to fill the rinse tank
and at right angles to stop.
Watch closely when filling
the rinse tank as it only
holds 100 gallons.
Fig. 36 VALVE OPERATION
42
c
A
B
A
B
B
C
C
Содержание Fast Sprayers 9500 Series
Страница 68: ...63 Fig 62 BOOM TILT PIVOT 3 Grease boom tilt pivot 1 location each boom Left Right...
Страница 78: ...73 This page left blank...
Страница 88: ...7 4 CHEMICAL CIRCUIT SCHEMATIC 82...
Страница 89: ...7 5 ELECTRICAL SCHEMATIC CABLE 10 CONSOLE 3 OR 6 BOOM SCS 440 450 CONSOLES...
Страница 90: ...CABLE 33 FLOW CONTROLLER 3 OR 6 BOOM VALVES 84...
Страница 92: ...86 7 7 9500 SERIES 5 FUNCTION HYDRAULIC CAB BOX 9600 SERIES 60...
Страница 93: ...7 8 9500 SERIES 5 FUNCTION CAB BOX WIRING 9600 SERIES 60...
Страница 94: ...7 9 9600 SERIES 80 100 6 FUNCTION HYDRAULIC BLOCK 88...
Страница 95: ...7 10 9600 SERIES 80 100 6 STATION CAB BOX...
Страница 96: ...7 11 9600 SERIES 80 100 6 STATION CAB BOX WIRING 90...
Страница 97: ...7 12 PARTS LIST FOR YAW BLOCK 91 7 12 9500 SERIES 120 132 YAW BLOCK...
Страница 98: ...7 13 9500 SERIES 120 132 YAW BLOCK HARNESS 92...
Страница 99: ...7 14 9500 SERIES 120 132 YAW CAB BOX...
Страница 100: ...7 15 9500 SERIES 120 132 YAW CAB BOX WIRING 94...
Страница 102: ......
Страница 103: ......