11
differential lock, its engagement, disengagement and adjustment,
use of power take-off,
how to use the hydraulic lift system, attach/detach implements and use of stabilizers.
use of external hydraulics,
four-wheel drive, its engagement and disengagement,
the method of making the wheel track adjustments, front wheel alignment and use of correct tyre
pressure,
cooling system, frost precautions and fan belt adjustment.
maintenance of the engine air cleaner,
fuel system and how to remove the air,
electrical system maintenance,
bolts and nuts fastening,
grease points,
oil changes and location of drain plugs, filler plugs and dipsticks,
filter replacement and cleaning,
transport and storage of fuel,
warranty entitlement and the services due during the warranty period.
Pre-delivery inspection
The following items must be checked, and where necessary, corrected by the Dealer before
delivery:
1. Verify serial numbers of the tractor and engine.
2. Assemble parts removed for transport.
3. Check the tractor against its specification.
4. Examine the condition of factory seals.
5. Remove water and impurities from water trap and bleed the fuel system.
6. Check the liquid level in the cooling system and in screen washer system.
7. Check the oil level in all system.
8. Check the battery electrolyte level and electrolyte concentration.
9. Lubricate all grease points, if necessary.
10. Check for tightness and locking all external nuts, bolts, screw, plugs, connections, and clamping
bands (special attention should be paid to air intake and cooling system hose and pipe
connections).
11. Ensure that pipes, hoses and wiring are not fouling exhaust system or sharp edges.
12. Check the fan and air compressor (if fitted) V-belt tension.
13. Check clutch pedal free travel.
14. Check tyre pressure.
15. Check front wheel alignment and hub bearings for play.
16. Check the safety start switch function.
17. Check the headlight setting.
18. Road test the tractor checking all instruments, controls and services for correct function.
19. After road test, check for leaks.
Содержание 675
Страница 1: ...Kullanım Kılavuzu Farmtrac 675 675DT ...
Страница 62: ...62 8 WIRING DIAGRAMS FT 675 WIRING DIAGRAM without cab ...