29
Revision date: 02.16.23
111628E
INSTALL THE SUPPLY MANIFOLD — continued
4
Assembly Instructions
ATTENTION:
Handle the supply manifold carefully during installation to prevent
damage to the supply tube fittings! These can break if handled improperly!
2. After attaching all pipe hangers to the frame, take the 112309 PVC
supply manifold and position it against the installed hangers.
NOTE:
This procedure shows attaching the manifold to the frame
before adding the supply tube assemblies. These tube assemblies
can be installed before you secure the manifold to the frame. Steps
3 and 4 describe the installation of the supply tubes.
STAND-ALONE UNIT
ONLY—
If main water line
is attached to bottom of
manifold, cement WF2990 slip
cap in place at top using PVC
primer and PVC cement.
If the water main is attached to
the top of the manifold, install
the WF3311 ball valve at the
bottom. See Page 4.
Position the manifold
fittings approximately
7" above the 4-way
fitting on the frame.
Manifold fittings must
remain above the
fodder trays.
CONNECTING
MULTIPLE SYSTEMS—
See the information
on Page 4 if attaching
the water supply line to
multiple fodder systems.
Supply Manifold