23
Revision date: 02.16.23
111628E
2
Complete these steps:
1. Place one 12' channel (111582) on a flat surface for assembly. Cover the
assembly surface if needed to protect it from the adhesive.
2. Attach the plain end cap (drilled hole–111030) to one end of the 12'
channel.
Coat all edges of the channel end with adhesive before installing
the cap.
Cut nozzle tip at a 45° angle and just enough to allow the
adhesive to flow. A thin, continuous bead is all that is required.
3. Move to the other end of the channel and install the 111029 end cap (with
outlet).
Coat all edges of the channel end with adhesive before installing
the cap.
4. Repeat Steps 1-3 for all remaining 12' channels.
5. Once all end caps are in place, carefully flip over one channel so the
bottom is facing up and the open top is down.
6. Take the adhesive and secure the end caps to the 12' channel. Photos
show securing the end cap with an outlet. Secure the plain end caps in the
same manner.
ASSEMBLE ALL 12' FODDER CHANNELS: 111582
NOTE:
Apply the adhesive to the
outside of the channel assembly
. Seal
all edges and seams of the end caps to prevent leaks.
Apply the adhesive
to the inside of the channel only as needed to repair leaks. Verify that
surfaces are dry before applying additional adhesive to seal end caps.
7. Repeat for all remaining 12' fodder channels.
8. Allow the adhesive to dry before moving the channels or testing the
system. See the note to the right to test channels for leaks.
NOTE:
Read the instructions on the adhesive container for recommended
drying times.
9. Continue with the assembly of the drain manifold.
Apply adhesive in a well-ventilated area. Read the 112509 adhesive
container information for additional precautions.
Required parts:
• 111029 End Cap (w/outlet) and 111030 End Cap (plain);
111582 GT80 NFT Channels @ 12' long (each)
• 112509 Instant Adhesive
Assembly Instructions
ATTENTION:
Coat the seams evenly
with a thick layer of adhesive to coat
all gaps. Once the adhesive has dried
according to the directions, fill channel
with water, set on a level, dry surface,
and check for leaks. Reseal if necessary.
When checking for leaks, slide a 90°
elbow onto the outlet end cap and turn
the open end of the elbow to the 12
o'clock position, and fill the channel.
Fill with water and
check for leaks.
C
111029
D
A
111030
E
F
bottom
DO NOT GLUE ELBOW TO THE END CAP!
GLUE
111582 Channel (12')
B