27
POLY BUILDINGS
Revision date: 03.15.12
MAIN COVER INSTALLATION (CONTINUED)
NOTE:
If additional ropes are needed, cut a slit in the
cover conduit pocket and pass the rope through the slit
and around the conduit. Do not cut the cover material,
cut only the conduit pocket.
7. Lift the conduit and ropes and pull cover edge to the
base of the shelter frame.
8. Throw the ropes over the frame and pull cover into
position. One person is needed on each rope to pull the
cover over the frame.
NOTE:
Do not pull on the black straps in the end
pockets of the cover. These straps will pull out.
9. Center the cover front-to-back and side-to-side on the
frame.
10. Move to the side ratchets and secure the sides of the
main cover by installing the straps as shown. Cut a
slit
in the cover pocket
(Fig. 1) or remove the pocket
material as shown (Fig. 2) to install the strap.
NOTE:
Do not fully tighten the side straps at this time.
Tighten enough to hold the main cover on the frame.
11. Beginning at one end of the main cover, determine the
height of the roll-up side and remove the hem area.
For example, if you want a 48" sidewall opening when
the sidewall is rolled up, remove 48" of the main
cover hem.
Maximum height of roll-up side is 60".
6. Attach ropes to each end of the
cover conduit
located
farthest from the frame. For shelters longer than 30',
attach additional ropes spaced evenly along the length
of the conduit if needed.
Ropes tied to
cover conduit
Sample frame shown.
Cover Conduit
ATTENTION:
Do not cut the strap contained within the
main cover. Do not remove too much of the bonnet.
Main
Cover
Conduit
Roll-up
section
of main
cover
Main
Cover
Conduit
Rafter
Fig. 1
Fig. 2
Inside
View
Outside
View
Strap
Roll-Up
Section of
Cover
Bonnet of Main Cover