background image

Two post hydraulic lift                                                                QJY3.0-E 

 

3

 

1  Safety 

1.1      Introduction 

Thoroughly read this manual before operating the lift and comply with the instructions. Always 
display the manual in a conspicuous location. 
Personal injury and property damage incurred due to non-compliance with these safety 
instructions are not covered by the product liability regulations. 

 

1.2      Symbols 

 

Failure to comply with instructions could result in personal injury 

 

Failure to comply with instructions could result in property damage 

 

Important information 

 

1.3      Intended Use 

The lift is designed for the safe lifting of automotive vehicles. Observe the rated load capacity 
and load distribution of the lift. 

 

Load distribution 

Front: Rear 

Load capacity 

Minimum 

Maximum 

QJY3.0-E 

3000kg 

2:3 

3:2 

 

In principle, the lift is designed for both 
approach directions. 
For a long service life, we recommend to use 
the short support arms for engaging the engine 
side of the vehicle. 

 

 

1.4      Safety Instructions for Commissioning 

  The lift may be installed and commissioned by authorized service personnel only. 
  The standard lift version may not be installed and commissioned in the vicinity of explosives 

or flammable liquids, outdoors or in moist rooms (e.g. car wash). 

Содержание QJY3.0-E

Страница 1: ...Two post hydraulic lift QJY3 0 E 1 Instructions and Maintenance Original Manual QJY3 0 E Two post lift without wheel...

Страница 2: ...ng transport and storage 7 3 1 Packing 7 3 2 Lifting and handling 7 3 3 Storage and stacking of packages 7 3 4 Delivery and check of packages 7 4 Installation 7 4 1 Space required 7 4 2 Installation s...

Страница 3: ...portant information 1 3 Intended Use The lift is designed for the safe lifting of automotive vehicles Observe the rated load capacity and load distribution of the lift Load distribution Front Rear Loa...

Страница 4: ...e apply the parking brake Use caution when removing or installing heavy components center of gravity displacement The main switch serves as emergency switch In case of emergency turn to OFF position P...

Страница 5: ...e the lift is raised the arm restraints are locked automatically to avoid any swivel under load 1 7 6 Pipe Break Valve The hydraulic cylinders are equipped with pipe break valves They respond in case...

Страница 6: ...110mm range of rubber pad 110 160mm adjustable scope for arm R750 R1130 size of outside column 3400mm size of inside column 2400mm Power supply 3 N PE 400V 50 Hz 6 6A Power 2 2 KW Noise 70dB Safety ca...

Страница 7: ...gravity and it s fragile parts 3 3 Storage and stacking of packages Packages must be stored in a covered place out of direct sunlight and in low humidity at a temperature between 10 C and 40 C 3 4 Del...

Страница 8: ...or 1 Choose anyone post Both of them are the same After that use a chalk line to layout a grid for the post locations and make an outline of the posts on the floor at each location 2 Before proceeding...

Страница 9: ...g hydraulic pipe according the hydraulic drawing Make sure the funnel used to fill the power unit is clean in summer and winter you should change the oil Step Four Lifting arms Install the arms as bel...

Страница 10: ...y slightly move the arms until the gear segments mesh Never unlatch the arm restraints when the lift is under load Each support arm is provided with an automatic arm restraint which unlatches automati...

Страница 11: ...arm restraints for engagement After raising the vehicle briefly stop and check adapters for secure contact l Turn the main switch to position ON and the lift is ready for operation l Push and hold UP...

Страница 12: ...s ready for operation 3 If the safety plate is in the engaged position briefly raise the lift before lowering 4 Pull the unlocking steel wire at both columns 5 Press the unloading handle until lift re...

Страница 13: ...ters 6 months Nuts of anchor bolts Check all nuts for correct torque and retighten them as required 12 months Hydraulic system l Check fluid level l Check tightness of hoses and fittings 6 2 Annual in...

Страница 14: ...on Slightly greases the slide tracks over their whole length using a brush l Arm extensions 1 Every six months check the support arm extensions for smooth operation 2 Grease as required 6 3 3 Operatio...

Страница 15: ...ten them as required Installation Torque Tinst 80Nm 6 4 Cleaning Do not use high pressure steam jet cleaners or caustic cleaning agents Risk of damage l Periodically wash off aggressive substances and...

Страница 16: ...w fluid level Check fluid level add fluid as required Motor starts up pressure build up insufficient to raise load Load on lift too heavy Reduce load observe rated load capacity Level difference betwe...

Страница 17: ...ches asymmetric loading arms For MD Annex IV machinery A sample of this machinery has been presented to Notified Body number 1105 CCQS UK Ltd Level 7 Westgate House Westgate Rd London W5 1YY UK Who ha...

Страница 18: ...Two post hydraulic lift QJY3 0 E 18 10 Attached drawings 10 1 Electrical drawing 10 2 Hydraulic drawings...

Страница 19: ...Two post hydraulic lift QJY3 0 E 19 10 3 Explosive view...

Отзывы: