Two post hydraulic lift QJY3.0-E
8
4.2 Installation steps
Step One (determine location and marks with chalk on the floor):
1. Choose anyone post (Both of them are the same. After that, use a chalk line to layout a grid for
the post locations and make an outline of the posts on the floor at each location.
2. Before proceeding, double check measurements and make certain that the bases of each
column are square and aligned with the chalk line.