1. Components detail
1
2
3
4
5
6
r
inspectable box (base+cover)
box locking heads
oller tube + fabric
radio controlled motor myShell-Becker
nylon pulley
nylon cap + holder plate + cap mounting pin
T.30 guide tracks
bottom rail slider set
guide end cap + myShell hook and release device
rope transfer unit
bottom rail (base+cover)
7
8
9
10
11
12
motor holder
T.30
4
FANANI / ASSEMBLY INSTRUCTIONS
Fixing .2a
Guide direct fixing
- hole greater than
- hole less than
Ø11 for stopper
Ø6.5 for screws
1) drill the side guide as indicated
2) place the roller blind onto the existing structure
and place the guides into the side supports;
3) check the squaring and fix the guide to the box
ATTENTION : in presence of led stripes, insert them
before placing the guides.
i
IMPORTANT:
AT THIS STAGE SET THE
GUIDES ONLY INTO THE
BOX
T.30
5
FANANI / ASSEMBLY INSTRUCTIONS
i
IMPORTANT:
WHERE
THERE IS A DRAUGHTPROOF
PROFILE LEAVE AT LEAST A 1
cm SPACE BETWEEN THE
GUIDE TRACK AND THE
EXISTING STRUCTURE
ROLLER BLIND SET
composed of:
- box
- bottom rail
- myShell hooking unit
- tube with fabric
Содержание T.30
Страница 1: ...Rev 2 04 17 T 30 ASSEMBLY INSTRUCTIONS WITHRADIO SOFTWARE5 14 MOTOR...
Страница 2: ......