3.Rope positioning
T.30
8
FANANI / ASSEMBLY INSTRUCTIONS
a
Ropes tightening .3
T.30
9
FANANI / ASSEMBLY INSTRUCTIONS
IMPORTANT: take great care that the ROPES HAVE TO RUN PARALLELY
1) tighten the cable in the pull cord choker
(a);
2) tighten first one cable, then the other
symmetrically (in order to stretch the
springs);
3) get the maximal tension by reaching the
4) close the bottom rail cover and secure it
with its screws
5) fit the box cover to the guide with its
screws as well
1) remove the round headed stainless
steel screws from the box;
2) take the cables and the myShell
locking unit to the end of the structure
3) remove the stainless steel self-
tapping cap screws from the bottom rail
cover
4) open the bottom rail cover and put it
in a safe place
5) remove the screws from the guide end cap (a)
6) place the lock (b) inside the guide
7) insert the guide end cap (c) with cable into the guide
8) place the screws back in the guide end cap (a)
b
a
c
IMPORTANT:
Check that the ropes are not come out of the pulleys; if so before placing the
guides put the ropes back in the correct position.
Check that the ropes do not pass above the bottom rail bogie; if so place the
ropes under it because the operation with crossed ropes might determine
stretching, unravelling and breakings.
During the guides insertion operation pay attention to do not squeeze the
ropes between the guide profile and its support to avoid unravelling and
breaking. (It is suggested to do this operation in two people)
Do not scratch the ropes on the aluminium profiles edges to avoid unravelling
and breakings.
Содержание T.30
Страница 1: ...Rev 2 04 17 T 30 ASSEMBLY INSTRUCTIONS WITHRADIO SOFTWARE5 14 MOTOR...
Страница 2: ......