6 EN
English
WATER CONNECTIONS
•
No leaks from the connections or tubes
FUNCTIONING
•
Boiler and operating pressures are normal.
•
The pressure gauge is working properly.
•
The self-levelling device is working properly.
•
The expansion valves are working properly
GROUPS
•
+RRNXSWKH¿OWHUKROGHUVWRWKHJURXSVZLWKRXWFRIIHH
•
Let each group dispense water for about a minute.
HOT WATER
•
Continuously dispense hot water (pressing the appropriate button) until at least 6 litres of water have been dispensed
for a machine with 2 groups (see the “Hot water dispensing” chapter in the User’s Manual).
STEAM
•
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
WARNING
: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C)
.
WARNING
: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
5. Installation Check-up
Содержание SMART / A
Страница 2: ......
Страница 3: ...I...
Страница 4: ...II...
Страница 6: ...IV SMART A R 18 21 20 17 19 16 15 1 10 7 6 7 9 2 8 6 2 14 12 11 10...
Страница 10: ...VIII...
Страница 20: ...Italiano 7...
Страница 36: ...10 EN English...
Страница 52: ...10 FR Fran ais...
Страница 68: ...10 DE Deutsch...
Страница 84: ...10 ES Espa ol...
Страница 100: ...10 PT Portugu s...
Страница 108: ...X X...
Страница 111: ......