manualshive.com logo in svg
background image

CORAL

Pic. 13

VERSION OF CORAL WITH SOLENOID VALVE

In the version of 

CORAL with solenoid valve

 no manual overriding action is needed, and in case of power failure the post descends 

automatically  ush  with  pavement  level.  To  enable  the  solenoid  valve  to  operate  properly,  the  electric  wires  labelled 
“ELETTROVALVOLA - Solenoid valve” from the post assembly are to be connected, through the 

voltage stabilizer

, to terminals 22 

and 23 in the Elpro S40 control box.

GROUND-LEVEL CLOSURE - COVER PLATE

• Use the four screws to close the cover plate.
• Lift the retractable post for facilitate closure of the post cover 
with the buffer, give the command (by encoding a transmitter 
with the radio receiver or a key switch) to lift the retractable 
post.

Post cover

Rubber buffer

Cover plate

Retractable

post

GREASE

IMPORTANT: WE RECOMMEND

GREASING ALL CLAMPING

SCREWS

!

Pic. 12

CORAL with solenoid valve

230 V

230 V

=

=

NO

CORAL with solenoid valve

SOLENOID VALVE

22 23

STABILIZER

CORAL with solenoid valve

             ATTENTION: IT IS REQUIRED THAT

THE  POST  BE  ASSISTED  TO  REACH  THE 

FULLY FLAT DOWN POSITION

10

fully retractable oil-hydraulic bollard

Содержание CORAL 1050

Страница 1: ...EN 13241 EN 12453 EN 12445 CORAL 1050 1063 1080 Instructions manual pages 1 16 the gate opener FULLY RETRACTABLE OIL HYDRAULIC BOLLARDS POST DIAMETER 100 mm HALL MAGNETIC LIMIT SWITCH GB...

Страница 2: ...ith a pedestrian entrance it is appropriate to prepare the system in such a way to prohibit the operation of the engine when the pedestrian entrance is used Apply safety nameplates with CE marking on...

Страница 3: ...erator can be introduced ready for operation as soon as the wiring has been completed As soon as the retractable post receives a command from a key switch or radio transmitter it rises from its interr...

Страница 4: ...tail of retractable post with hoisting connection PRELIMINARY OPENING OF ALL FUNCTIONAL COMPONENTS Start by removing the cover plate to reveal the operator and separate the individual components with...

Страница 5: ...res use electric cables with sections suited to the installation Pic 3 230V 50 Hz 1 2 3 4 5 6 6 7 2x1 mm 2x1 mm 3x1 mm 4x1 mm 4x1 mm 4x1 mm 8 10 11 8 9 1 Led ashing light with built in aerial 2 Stand...

Страница 6: ...Pic 4 Pic 5 IMPORTANT once the housing has been positioned and installation completed it is important for the top edge to be level with the ground Piping 5 cm for passage of electric wires Concrete c...

Страница 7: ...r inside the housing Pic 6 IMPORTANT PASS THE MOTOR LIMIT SWITCH SOLENOID VALVE AND LED POWER SUPPLY ELECTRIC WIRES THROUGH THE PIPING WITHOUT TEARING OR CUTTING THE CABLES Hoisting hook Oil hydraulic...

Страница 8: ...near the installation to prevent interference or any a ecting action with the magnetic loops of the vehicle detecting device if installed or with any other electronic equipment included in the system...

Страница 9: ...are properly alight the post should move up on the rst commanding pulse should it fail disconnect power supply and swap the connections to the live terminals NOTE WELL supply the system with electric...

Страница 10: ...GROUND LEVEL CLOSURE COVER PLATE Use the four screws to close the cover plate Lift the retractable post for facilitate closure of the post cover with the bu er give the command by encoding a transmit...

Страница 11: ...ds IP 67 A 40 C with speci c optional accessories Ref General Catalogue PERFORMANCE CORAL 1050 Frequency of use intensive Service cycle rise 4 7 s dwell 30 s lower 4 4 s dwell 30 s Complete cycle time...

Страница 12: ...lard to avoid that settling at a later stage causes problems to the system 5 Make sure the site is free from utilities that may interfere with it 6 Make sure that electromagnetic sources are at a suit...

Страница 13: ...CORAL 13 fully retractable oil hydraulic bollard...

Страница 14: ...14 CORAL fully retractable oil hydraulic bollard...

Страница 15: ...antity of models installed Maintainer Date NOTE WELL this document must record any ordinary and extraordinary services including installation maintenance repairs and replacements to be made only by us...

Страница 16: ...extra capacitor to the existing one instructions manual is to be referred to Check the correct functioning of the signal LED lights if incorporated in the bollard head Sight check the electronic board...

Отзывы: