manualshive.com logo in svg
background image

CORAL

9

ELECTRICAL CONNECTIONS TO THE CONTROL BOARD

Pic. 11

Pic. 10

FIRST OPERATION MANOEUVRES

Having terminated installation of the traffic control post and all the safety and control accessories (

all of the NC contacts on the 

Elpro S40 board are to be bridged

), and the respective connections with the Elpro S40 programmer, and having completed 

thorough risk analysis, the  rst operation manoeuvres can be performed. If you have a radio transmitter, encode the radio receiver 
according to the relative instructions before giving the command to raise the retractable post, or give the manoeuvre command 
using a key switch. Once power is supplied, connect the motor/pump cable and, satis ed that the limit switch LEDs are properly 
alight, the post should move up on the  rst commanding pulse; should it fail, disconnect power supply and swap the connections 
to the live terminals.

NOTE WELL: supply the system with electric power only after all of the electrical connections have been made as 

required for proper operations.

20 µF

A

NC

230 V

1

st

 pulse

In case of multiple installations go

through the same procedure with each post

All NC contacts are to be closed

B

Should the motor fail

to drive the post up by

rst pulsing, swap the

connections to the electric

motor live terminals only

16

18

17

16

18

17

ELPRO S40

Standard Coral

Coral with

LED lights

Coral with

LED lights

Coral with

solenoid valve

20 µF

Coral with LED lights

A

11 12 13

16 17 18

22 23

52 53

52 53

B

STABILIZER

55 56

+          -

FINECORSA

EFFETTO HALL - cavo blu

HALL LIMIT SWITCHES

- blue cable

CORAL bollard

with HALL

limit switches

fully retractable oil-hydraulic bollard

!

Содержание CORAL 1050

Страница 1: ...EN 13241 EN 12453 EN 12445 CORAL 1050 1063 1080 Instructions manual pages 1 16 the gate opener FULLY RETRACTABLE OIL HYDRAULIC BOLLARDS POST DIAMETER 100 mm HALL MAGNETIC LIMIT SWITCH GB...

Страница 2: ...ith a pedestrian entrance it is appropriate to prepare the system in such a way to prohibit the operation of the engine when the pedestrian entrance is used Apply safety nameplates with CE marking on...

Страница 3: ...erator can be introduced ready for operation as soon as the wiring has been completed As soon as the retractable post receives a command from a key switch or radio transmitter it rises from its interr...

Страница 4: ...tail of retractable post with hoisting connection PRELIMINARY OPENING OF ALL FUNCTIONAL COMPONENTS Start by removing the cover plate to reveal the operator and separate the individual components with...

Страница 5: ...res use electric cables with sections suited to the installation Pic 3 230V 50 Hz 1 2 3 4 5 6 6 7 2x1 mm 2x1 mm 3x1 mm 4x1 mm 4x1 mm 4x1 mm 8 10 11 8 9 1 Led ashing light with built in aerial 2 Stand...

Страница 6: ...Pic 4 Pic 5 IMPORTANT once the housing has been positioned and installation completed it is important for the top edge to be level with the ground Piping 5 cm for passage of electric wires Concrete c...

Страница 7: ...r inside the housing Pic 6 IMPORTANT PASS THE MOTOR LIMIT SWITCH SOLENOID VALVE AND LED POWER SUPPLY ELECTRIC WIRES THROUGH THE PIPING WITHOUT TEARING OR CUTTING THE CABLES Hoisting hook Oil hydraulic...

Страница 8: ...near the installation to prevent interference or any a ecting action with the magnetic loops of the vehicle detecting device if installed or with any other electronic equipment included in the system...

Страница 9: ...are properly alight the post should move up on the rst commanding pulse should it fail disconnect power supply and swap the connections to the live terminals NOTE WELL supply the system with electric...

Страница 10: ...GROUND LEVEL CLOSURE COVER PLATE Use the four screws to close the cover plate Lift the retractable post for facilitate closure of the post cover with the bu er give the command by encoding a transmit...

Страница 11: ...ds IP 67 A 40 C with speci c optional accessories Ref General Catalogue PERFORMANCE CORAL 1050 Frequency of use intensive Service cycle rise 4 7 s dwell 30 s lower 4 4 s dwell 30 s Complete cycle time...

Страница 12: ...lard to avoid that settling at a later stage causes problems to the system 5 Make sure the site is free from utilities that may interfere with it 6 Make sure that electromagnetic sources are at a suit...

Страница 13: ...CORAL 13 fully retractable oil hydraulic bollard...

Страница 14: ...14 CORAL fully retractable oil hydraulic bollard...

Страница 15: ...antity of models installed Maintainer Date NOTE WELL this document must record any ordinary and extraordinary services including installation maintenance repairs and replacements to be made only by us...

Страница 16: ...extra capacitor to the existing one instructions manual is to be referred to Check the correct functioning of the signal LED lights if incorporated in the bollard head Sight check the electronic board...

Отзывы: