manualshive.com logo in svg
background image

S2500I 

532324 - Rev. A

12 

FAAC S.p.A. Soc. Unipersonale
Via Calari, 10 - 40069 Zola Predosa BOLOGNA - ITÁLIE
Tel. +39 051 61724 - Fax +39 051 09 57 820
www.faac.it - www.faacgroup.com

Order: 

83469 

Item origin: 

sampled and supplied by the customer 

Activity date: 

25 February  2020 

Activity site: 

FAAC S.p.A. Via Monaldo Calari, 10 - 40069 Zola 

Predosa (BO) - Italy 

Contents 

Page 

Description of item* 

2

 

Apparatus 

2

 

Method 

3

 

Environmental conditions 

3

 

Results 

4

 

 

This document is made up of 4 pages and 1 annex

 

and 

shall  not  be  reproduced  except  in  full  without 

extrapolating parts of interest at the discretion of the 

customer,  with  the  risk  of  favoring  an  incorrect 

interpretation  of  the  results,  except  as  defined  at 

contractual level.  

The  results  relate  only  to  the  item  examined,  as 

received, and are valid only in the conditions in which 

the activity was carried out. 

This  document  is  the  English  translation  of  the  test 

report  No.  370431  dated  18  March  2020  issued  in 

Italian; in case of dispute the only valid version is the 

Italian one. Date of translation: 18 March 2020. 

The original of this document consists of an electronic 

document digitally signed pursuant to the applicable 

Italian Legislation. 

 

Chief Test Technician: 

Dott. Giacomo Rito 

Head of Security and Safety Laboratory: 

Dott. Andrea Bruschi 

 

Compiler:

 Agostino Vasini 

Reviewer:

 Dott. Giacomo Rito  

 

Page 1 of 4 

 

 

 

 

Istituto Giordano S.p.A. 

Via Gioacchino Rossini, 2 

47814 Bellaria-Igea Marina (RN) - Italia 

 

Tel. +39 0541 343030 - Fax +39 0541 345540 

www.giordano.it 

[email protected] 

PEC: [email protected] 

Codice fiscale/Partita IVA: 00 549 540 409 

Capitale sociale € 1.500.000 i.v. 

R.E.A. c/o C.C.I.A.A. (RN) 156766 

Registro Imprese della Romagna - Forlì-Cesena e Rimini n. 00 549 540 409 

 

TEST REPORT No. 370431 

Customer 

FAAC S.p.A. 

Via Monaldo Calari, 10 - 40069 ZOLA PREDOSA (BO) - Italy 

Item* 

hinge kit for gates named 

“cerniera S2500l” 

Activity 

 

determination of mechanical resistance under load  

Results 

 

Loading condition 

Deformation 

 

Transducer No. 1  Transducer No. 2 

 

[mm] 

[mm] 

addition of 100 kg 

0,01 

0,04 

addition of 200 kg 

0,03 

0,06 

addition of 300 kg 

0,14 

0,14 

addition of 400 kg 

0,33 

0,34 

addition of 500 kg 

0,52 

0,54 

addition of 600 kg 

0,80 

0,60 

45° movement with maximum load  

0,92 

0,70 

90° movement with maximum load 

0,68 

0,35 

initial position with maximum load  

1,31 

0,45 

after 15 min with maximum load  

1,50 

0,44 

residual after discharge 

0,68 

0,20 

  

 

(*)  according to that stated by the customer. 

Bellaria-Igea Marina - Italy, 18 March 2020 

Chief Executive Officer 

Содержание S2500I CERNIERA

Страница 1: ...ion nelles Pourl actionnementduvantailentoutes curit lacharni reFAACS2500Idoit treassoci e unecharni reinf rieure NONfournieparFAAC indiqu eetdimensionn e pour le support du vantail ne pas interposer...

Страница 2: ...everde onderstescharnierdiegeschiktisvoorhetdragenvandevleugel aangezien de automatisering van de poort is voorzien moet voor het bepalen van de afmeting van het onderste scharnier rekening worden geh...

Страница 3: ...sicurezzadell installazione pergarantirestabilit econtrollodell antainmovimen to Se non viene utilizzato il KIT di fornitura FAAC responsabilit dell installatore realizzare una staffa idonea ai carich...

Страница 4: ...du pilier DE VOR BEREITUNG DER SCHARNIERPLATTE Die Schwingungsd mpferkappen und Abdeckungsbefestigungen anbringen Muttern und Schrauben nur teilweise anziehen Die Seitenplatten je nach Gr e des Pfeil...

Страница 5: ...0 100x100 7 9 8 6 S2500I 5 532324 Rev A 13 6 0 x 2 13 6 0 x 2 13 6 0 x 2 M8 DIN985 CL 6 S ZB M8 DIN985 CL 6 S ZB M8 DIN985 CL 6 S ZB 6 0 x 2 6 0 x 2 6 0 x 2 9 x 4 9 x 4 9 x 4 100 00 100 00 100 00 100...

Страница 6: ...ifanti chuteappropri DE DenTorfl gel auf das untere Scharnier montieren und vertikal ausrichten DenTorfl gel mittels einer geeigneten Fallschutzvorrichtung in Sicherheitsposition versetzen ES Monte la...

Страница 7: ...djsoukdispozicivestavn mechanick dorazy nainstalujtejevt tof zi vizp slu n odd l FR Fixeraveclesvisetlesrondellesfourniesenappliquantle coupledeserragede22Nm Silesbut esm caniquesint gr essontpr vues...

Страница 8: ...ealizarse pr ximamente protejalosterminalesdelaoxidaci n NL Bevestigdekabelsuitdebuurtvandetandwielen Alsdeaansluitingnietbinnenkortetijdwordtuitgevoerd moeten de aansluitklemmen tegen oxidatie worden...

Страница 9: ...emontieren DieSchraubenNICHTvollst ndiganziehen Gepr fen dassdasR derwerkmittigaufderDrehachseausgerichtetist entsprechenden Abs tze 4 Die Schrauben anziehen Anzugsmoment 22 Nm 5 Die langen Stifte anz...

Страница 10: ...v ny s otvory v k dle FR Pour permettre la prise des goujons d alignement tous les trous de l trier doivent tre pr sents sur le vantail DE Alle Bohrungen des B gels m ssen mit denen auf dem Torfl gel...

Страница 11: ...rios Accessoires 1 2 3 120x120 100x100 S2500I 11 532324 Rev A 3 x 4 3 x 4 x 4 x 4 4 2 M5 x 4 4 2 M5 x 4 ADATATORE PER PILASTRO CS Adapt r pro sloupek FR Adaptateur pour pilier DE Adapter f r Pfeiler E...

Страница 12: ...to the applicable Italian Legislation ChiefTest Technician Dott Giacomo Rito Head ofSecurityand SafetyLaboratory Dott Andrea Bruschi Compiler Agostino Vasini Reviewer Dott Giacomo Rito Page 1of 4 Ist...

Отзывы: