manualshive.com logo in svg
background image

7

2.5 in

2

8 ¾

0 to 2

 - Measurements in Inches

Fig. 2

Fig. 3

  Operator 844 

  Photocells

  Key-operated push-button

  Flashing lamp

  Radio receiver

15 ¼

10 ¾

6

7 ½

- Measurements in Inches

8 ¾

VAC ~ 15 AWG

20 AWG

20 AWG

20 AWG

20 AWG

15 AW

G

2. DIMENSIONS

3. ELECTRICAL LAYOUT

4. INSTALLATION

4.1.  

Preliminary Checks

To ensure safety and an efficiently operating automated sy-
stem, make sure the following conditions are observed:
•  The gate structure must be suitable for automation. For 

example, wheel diameter must be in proportion to the 
weight of the gate to be automated, an upper guide 
must be provided, mechanical stop limits to prevent the 
gate derailing must be installed.

•  The soil must permit sufficient stability for the concrete pad.
•  There must be no pipes or electric cables in the pad 

excavation area.

•  If the operator is exposed to passing vehicles, install, if 

possible, adequate means of protection against acci-
dental impact.

•  Check if an efficient grounding is available for connection 

to the gearmotor.

4.2.  

Foundation Plate Installation

1.  Assemble the foundation plate as shown in Fig 4. The 

foundation plate must be located as shown in Fig 5 (right 
closing) or Fig 6 (left closing) to ensure that the rack and 
pinion mesh correctly.

2.  Prepare a concrete pad as shown in Fig.7, following the 

suggested dimensions. It’s recommended to have the pad 
a minimum of 4” above level grade to avoid any flooding 
of the operator. The underground depth of the concrete 
pad is determined by the soil condition and the local 
building codes. Make sure the concrete pad is leveled.

3.  Provide one or more conduit pathways for all power and 

accessory connections. Extend the conduit about of 1/2” 
above the level of the concrete pad. 

4.  After the concrete is poured in the forms and before it 

has a chance to set, insert the foundation plate into the 
cement and position it flush with the top of the concrete 
and aligned with the top of the lower gate frame. Use the 
dimensions shown in Figs 5 or 6 to align your foundation 
plate. Allow the concrete to set for a minimum of two days 
before installing the operator.

5.  Route the wires in the conduits. To facilitate the connec-

tions allow for about 15” of extra length of cables out of 
the conduit. Separate the high and low voltage wires in 
different conduits.

Fig. 4

Fig. 5

0 to 2

2

6

 - Measurements in Inches

Fig. 6

Содержание 844

Страница 1: ...FAAC International Inc Headquarter East Coast Operations 3160 Murrell Rd Rockledge FL 32955 Tel 800 221 8278 www faacusa com FAAC International Inc West Coast Operations 357 South Acacia Avenue Fuller...

Страница 2: ...inions 9 5 CONTROL BOARD 780D 10 5 1 Warnings 10 5 2 780D Technical Specifications 10 5 3 Layout And Components 10 5 4 Electric Connections 11 5 5 Programming 13 6 START UP 16 6 1 Electric Connections...

Страница 3: ...located within line of sight of the gate Activation of the reset control shall not cause the operator to start 7 All warning signs and placards must be installed and easily seen within visible proxim...

Страница 4: ...unreasonable use If a gate system component malfunctions disconnect the main power before attempting to repair it Do not impede the movement of the gate you may injure yourself or damage the gate sys...

Страница 5: ...loading docks or other locations not intended to service the general public RESTRICTED ACCESS VEHICULAR GATE OPERATOR CLASS IV A vehicular gate operator system intended for use in guarded industrial l...

Страница 6: ...he 844 gearmotor can operate non stop at 70 use frequency To ensure efficient operation operate in the work range below the curve Important The curve is obtained at a temperature of 75 F Expo sure to...

Страница 7: ...wn in Fig 4 The foundation plate must be located as shown in Fig 5 right closing or Fig 6 left closing to ensure that the rack and pinion mesh correctly 2 Prepare a concrete pad as shown in Fig 7 foll...

Страница 8: ...on and weld the threaded dowel nut to the gate as shown in Fig 15 4 Move the gate manually checking that the rack is resting on the pinion then weld the second and third dowel nut 5 Place another rack...

Страница 9: ...between rack and pinion 4 5 INSTALLATION OF CHAIN PINIONS 3 Insert the pin g on the shaft using a hammer 4 Fit the idle transmissions bracket on the operator flange using the four screws a M5 x 12 and...

Страница 10: ...installers only AC power should be supplied from a circuit breaker panel and must have its own dedicated circuit breaker This supply must include a green ground conductor Properly ground the gate oper...

Страница 11: ...g after two seconds Encoder Monitors for an obstacle during gate opening and closing movements It causes immediate reversal of motion and stopping after two seconds Note For compliance with the UL325...

Страница 12: ...scription of operation in the different logics Fig 26 Connection of a pair of monitored opening photocells and a monitored closing edge SAFE OPEN B A OPEN OP CL 7 9 ON XS 55 CN 60 E 1 4 OPEN EDGE XS 5...

Страница 13: ...tact stops gate movement To install several STOP devices connect the N C contacts in series Fig 31 Note If STOP devices are not connected jumper the STOP and terminals Connection of two Stop N C conta...

Страница 14: ...tections from the inherent entrapment protection device encoder In this status the operator will also set off the audio alarm Normal operation can only be resumed by breaking the stop circuit or reset...

Страница 15: ...ovement and restart it when they are released or they reverse it immedia tely Reverse immediately to closing Restart movement on release ENCODER The encoder operates as an anti crushing device If the...

Страница 16: ...1 then move the magnet forward an additional 1 3 4 inches 6 Move the gate to its halfway travel point and relock the system see Sec 9 7 Find out the desired pre and post limit switch decelera tion val...

Страница 17: ...system The distance between the limit switch and the plates must be 3 16 inch LEDS ON OFF OP A Command activated Command inactive OP B Command activated Command inactive FC1 Limit switch free Limit s...

Страница 18: ...screwdri ver as shown in Fig 37 Ref A To increase torque turn the screw clockwise To reduce torque turn the screw counter clockwise 3 Power up the operator and check that the torque you have just set...

Страница 19: ...t least once every 6 months especially the efficiency of the safety and release devices including operator thrust force 10 1 REMOVING BOARD AND TRANSFORMER If you have to disassemble the transformer b...

Страница 20: ...e s a e l e r n o d n a s k c o L g n i n e p o 2 2 r o f e s o l c o t s e s r e v e R D E K C O L 3 f a e l e h t s e s o l C t c e f f e o N d e l b a s i d N E P O t c e f f e o N t c e f f e o N...

Страница 21: ...f n e p o o t s e s r e v e R G N I N E P O n o i t a r e p o s p o t S n o i t a r e p o s p o t S d e l b a s i d A N E P O t c e f f e o N 2 2 r o f e s o l c o t s e s r e v e R Tab 3 f B c i g o...

Страница 22: ...t Head POS P N DESCRIPTION 17 40985115 Limit Switch Chain Version 7580375 Limit Switch Rack And Pinion Version 18 390516 Breather Plug Assembly 19 701002 Cap Scr sock hea 4X10 5931 8Gz 20 7099645 Gask...

Страница 23: ...Scr sock head 5X16 8G Z 56 71707615 Side Flange 57 7094085 Gasket Lateral Flange 58 7093005 Gasket For Motor Shaft A 25407 59 7070111 Bearing 6205 25 52 15 Econ 60 7061115 Pin 8X45 Ric uni En22338 61...

Страница 24: ...that the limit switch plate is not too far away from the limit switch The distance between a plate and the switch should be 3 16 in Check fuse F1 and replace it if necessary The gate opens but will n...

Страница 25: ...___________________________________________________________ _________________________________________________________________________________________ __________________________________________________...

Страница 26: ...___________________________________________________________ _________________________________________________________________________________________ __________________________________________________...

Страница 27: ...as been subject to misuse negli gence or accident or has not been operated in accordance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more severe th...

Страница 28: ...28 2017 FAAC International Inc All Rights Reserved Published in Jan 2017...

Отзывы: