manualshive.com logo in svg
background image

Page 17 

November, 2003 

400 Operator And  
455 D Control Panel Installation Manual  

A

CTIVATING

  D

EVICES

 

AND

  R

ADIO

  R

ECEIVER

: The activating 

devices and radio receiver for your gate must have 

normally open (N.O.) contacts. Connect such devices to 

terminals 9 and 14. 

 

N

OTE

: The FAAC radio receiver plugs into the 5 

prongs labeled J2 (Quick connect port). 

 

Page 19 shows how to connect a three or four wire 

receiver. 

 

D

ECODER

 C

ARD

: If you are installing the Digicard magnetic 

card reader, or the Digikey keyboard, use the quick-fit 

connector J2 for the DS decoder card (see Figure 1). 

 

N

OTE

: If your using both a receiver and decoder, 

hard wire the decoder and plug in the receiver. 

 

O

PEN

/H

OLD

 O

PEN

 D

EVICE

: To open and hold open the gate, 

simply maintain a contact across terminals 9 and 14.  

(“A” Mode only) 

  

S

TOP

  B

UTTON

: The stop button you install must have 

normally closed (N.C.) contacts. Multiple 

stop buttons must be wired in series. Connect your stop 

device between terminals 11 and 16. 

 

N

OTE

: The 455 will not operate the motors 

without a closed circuit between 11 & 16. 

 

The LED Indicators: The nine light emitting diodes 

(LEDs) on the control panel can be used to check for 

the proper function of the devices attached to the 

panel. The LED lights are on whenever the contacts 

are closed across each of the respective terminals. 

 

OP_A and OP_B (Partial Opening) should illuminate 

only when an activating signal is sent for 2 and 1 gate 

leaves, respectively. STOP should be illuminated except 

when the stop button is pressed. FSWOP and FSWCL 

should be illuminated except when the reversing 

Figure 3.       

Wiring detail (a) inside 

the junction box and (b) 

from the junction box or  

operator to the high-

voltage terminal strip on 

the 455 D control panel 

F S W O P

F S W C L

O P _ A

O P _ B

S T O P

F C A 1

F C A 2

F C C 1

F C C 2

LED 

On 

Off 

OP_A 

Command Given 

No Command  

OP_B 

Command Given 

No Command  

Stop 

 No Command  

Command Given 

FSW  
Open 

Opening reversing 

devices clear 

Reversing device 

triggered 

FSW  
Close 

Closing reversing  

devices clear 

Reversing device 

triggered 

FCA1 
FCC1 

Flashes when gate coder is in use.  

Operator 1   

FCA 2 
FCC 2 

Flashes when gate coder is in use. 

Operator 2 

U.L. Listed Control Panel Enclosure 

Cord grip or 

conduit from  
U.L. Listed gate 

operator(s) 

(b) 

Op.1

 

Op.2

 

          

COM  OP  CL  COM  OP  CL 

       

 

J3

 

J4

 

High-voltage 

terminal strip 

455 MPS Control Panel 

 

Ground

 

J1

 

To the U. L. Listed gate operator 

To the U.L. Listed 

control panel 

U.L. Listed 
cord grip 

Junction box 

Legend 

White

 

Red

 

Black

 

Yellow/ 
Green

 

(a) 

Conduit to U.L. Listed 

control panel enclosure 

according to N.E.C. 

FSWOP

FSWCL

OP_A

OP_B

STOP

FCA1

FCA2

FCC1

FCC2

This display shows the normal 

status of the control panel. 

This display shows the 

meaning of each LED. 

Figure 12.  The 455 D display. 

T

HE

 455 D C

ON
T

R

OL

 P

AN
EL

 I

N

ST

A

LLAT

ION

 I

NST

R

UC
T

IO

N

S

 

Содержание 455 D

Страница 1: ...455 D Control Panel General Description 14 Installing the 455 D Control Panel 14 Connect the Main Power Supply 14 Connect the Operator to the Control Panel 15 Check the Motor s Direction of Rotation 1...

Страница 2: ...ons before the automatic operator is installed 4 An automatic operator should be installed on the inside of the property fence line Do not install the operator on the public side of the property fence...

Страница 3: ...mproper and therefore dangerous 2 When using any electrical equipment observe some fundamental rules Do not touch the equipment with damp or humid hands or feet Do not install or operate the equipment...

Страница 4: ...ened and or closed Operator dimensions l w h in cm 40 X 3 5 16 X 3 5 16 102 X 8 5 X 8 5 47 1 2 X 3 5 16 X 3 5 16 121 X 3 X 8 5 Operator weight lb kg 19 8 6 Power voltage required VAC7 115 VAC 10 60 Hz...

Страница 5: ...luded see Figure 1 If you have ordered a kit a pair of operators you will have twice the quantity of parts listed below except where noted and you will also have a radio receiver and two transmitters...

Страница 6: ...h the 400 Operator The Manual Release mechanism is a key operated device that disengages or engages the hydraulic system of the 400 Operator When the hydraulic system is disengaged you can open and cl...

Страница 7: ...g steps 1 Attach the rear mounting bracket 2 Attach the mounting hardware 3 Attach the front mounting bracket 4 Attach the operator to the gate 5 Adjust the operator pressure ATTACH THE REAR MOUNTING...

Страница 8: ...ately 6mm Note Be sure that the operator is level and that the gate is against the close positive stop Hold the front mounting bracket flush against the gate Mark the location of the front mounting br...

Страница 9: ...RNING The piston should not bottom out in either direction Doing so will seriously damage the operator Be sure that the gate reaches the positive stop before the piston bottoms out Adjust the swivel j...

Страница 10: ...ate the control panel in the most convenient position possible considering the movement of the gate Figure 7 shows a basic layout for a two leaf gate with the 400 Operator Installing the control panel...

Страница 11: ...the 400 operator should bleed itself Running the operator should remove any air from the system If the operator runs smooth throughout the swing no attempt to further bleed the unit is necessary If t...

Страница 12: ...Page 12 November 2003 400 Operator And 455 D Control Panel Installation Manual EXPLODED VIEW 400 CBAC...

Страница 13: ...2 36 7039025 Washer Swivel 1 37 702201 Swivel Jam Nut 10mm 1 38 7073025 Swivel Joint 1 39 N A Star Washer 5mm 2 POS PART NO DESCRIPTION QTY 40 7119405 Protective Cover End Cap Plug 2 41 7019195 Tie Ro...

Страница 14: ...cal codes The installer should refer to the installation manual for a given operator for more information NOTE An installation is U L compliant only when you install the FAAC operators according to th...

Страница 15: ...eaf gate design be sure to connect its operator to Motor 1 In order to wire motor 2 in a bi parting system connect the white wire to terminal 4 on the J4 terminal strip the black wire to 5 the red wir...

Страница 16: ...ain power and send an activating signal to the operator The gate leaf or leaves should open If a gate leaf closes then you need to turn off the main power and reverse the connection of the red and bla...

Страница 17: ...he respective terminals OP_A and OP_B Partial Opening should illuminate only when an activating signal is sent for 2 and 1 gate leaves respectively STOP should be illuminated except when the stop butt...

Страница 18: ...he delayed leaf closes at the end of the closing time Page 18 November 2003 400 Operator And 455 D Control Panel Installation Manual opening and closing respectively are triggered Use the LEDs and the...

Страница 19: ...17 Additional Reversing Devices TX RX 1 2 1 2 3 4 5 19 17 12 19 17 Additional Reversing Devices TX RX 1 2 19 12 17 15 Additional Reversing Devices 8 7 Saf ety Loop Detector f or closing 1 2 3 4 5 RX 1...

Страница 20: ...the value that can be modified with keys and When you reach the last function press the F key to exit the program and the display resumes showing the status of the inputs The table on page 9 shows the...

Страница 21: ...ns as a standard indicator light lighted at opening and pause flashing at closing and off when gate closed Different figures correspond to timed activation of the output which can be used via a relay...

Страница 22: ...leaves begin the opening movement The movement stops automatically when the opening positive stop is reached and the display stops flashing LEARNING OF OPERATING TIMES WARNING During the learning pro...

Страница 23: ...e gate operator reaches its positive stop the operator will automatically shut off An open command must be given to start closing gate operator 2 When gate operator 2 reaches the position that you wan...

Страница 24: ...g Reversing Device s Warning Light Closed Opens both leaves and closes them after pause time Opens single leaf connected to Motor 1 and closes it after pause time No effect No effect No effect Off Ope...

Страница 25: ...ens single leaf connected to Motor 1 No effect opening is in hibited No effect opening is inhibited No effect opening is inhibited Off Opening Stops Stops Stops Stops gate closes when reversing device...

Страница 26: ...tential of traffic getting backed up This distance is affected by the size of the gate how often it is used and how fast the gate operates The operator you choose to install on your gate must be desig...

Страница 27: ...your reversing devices If no reversing devices are installed make sure a circuit is installed between appropriate terminals PROBLEM THE GATE DOES NOT FULLY OPEN OR CLOSE SOLUTION Increase the bypass...

Страница 28: ...or has been subject to misuse negligence or accident or has not been operated in accordance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more sever...

Отзывы: