P

ROBLEM

: T

HE

 

GATE

 

DOES

 

NOT

 

RESPOND

 

TO

 

AN

 

ACTIVATING

 

SIGNAL

 

S

OLUTION

:

 

You should have at least one operator wired to 

terminals 1,2 and 3. 

 

Be sure that you have the motor start capacitors wired in 

terminals 2 and 3, 5 and 6 with the directional leads. 

 

Be sure that the torque/force setting is at the maximum 

setting of 50 in programming.  

 

Verify that the LEDs FSWOP, FSWCL, and the STOP are 

illuminated. If they are not illuminated, be sure that you 

have closed circuits in the stop and reversing inputs.  

 

Verify that your activating device works properly. OP_A  

should illuminate when you signal the gate to open. If 

OP_A does not illuminate when you signal the gate, then 

the problem may be in your activating device. Short 

across terminals 9 and 14. If the short causes the gate 

to open, then the problem is in the activating device. 

Repair or replace the device. 

 

P

ROBLEM

: T

HE

 

GATE

 

DOESN

'

T

 

OPEN

 (

OR

 

CLOSE

THOUGH

 

THE

 

MOTORS

 

ARE

 

RUNNING

 

S

OLUTION

:

 

Make sure that the motor is running in the right 

direction, and make sure the Manual Release 

mechanism has fully engaged the hydraulic system. 

 

 

P

ROBLEM

: T

HE

 

GATE

 

OPENS

 

BUT

 

DOES

 

NOT

 

CLOSE

.

 

 

S

OLUTION

:

 

Make sure you have selected the desired operating 

mode. 

 

Verify that the reversing devices are working properly. 

FSWOP and FSWCL should be illuminated except when a 

reversing device is triggered. If either does not 

illuminate, then one of your reversing devices is 

preventing the gate from responding to your signal. 

Check your reversing devices. 

 

If no reversing devices are installed, make sure a circuit 

is installed between appropriate terminals. 

 

P

ROBLEM

: T

HE

 

GATE

 

DOES

 

NOT

 

FULLY

 

OPEN

 (

OR

 

CLOSE

).

 

 

S

OLUTION

:

 

Increase the bypass pressure(s) to see if the hydraulic 

system needs more pressure. 

 

Check the operator's open/ close time selection. You 

should set a time that is just longer than the rated 

speed of your model of operator. For example, because 

the 400 CBAC has a rated opening time of 17 sec, you 

should set the time at 20 or 25 seconds. 

 

Check to see that there are no obstructions in the path 

of the gate or that the hinges are not binding. 

 

P

ROBLEM

: T

HE

 

OPERATOR

 

DOESN

'

T

 

WORK

 

SMOOTHLY

 

AND

 

THE

 

GATE

 

JERKS

 

AS

 

IT

 

OPENS

 

AND

 

CLOSES

 

S

OLUTION

Check the oil level in the operator. 

 

Make sure the Manual Release mechanism has fully 

engaged the hydraulic operation of the operator. 

 

Bleed the air from the hydraulic system. (See page 11). 

 

Make sure that a flexible gate leaf is not the problem. If 

the gate leaf flexes, then stiffen the gate or use a slower 

operator. 

 

P

ROBLEM

: T

HE

 

GATE

 

DRIFTS

 

OPEN

 

OR

 

CLOSE

 

WHEN

 

THE

 

MOTOR

 

IS

 

NOT

 

RUNNING

 

S

OLUTION

Remove the manual release valve, located next to the 

pressure adjustment screws, with a 6mm hex key.  Be 

sure that the white ring and the o’ring are not damaged.  

If not damaged, there may be internal damage and a 

seal kit will be needed to rebuild the unit.

 

T

ROUBLESHOOTING

 

WARNING! Before you do any work on the control panel,  

be sure to turn off the main power. 

NOTE: Any control panel specific information in the following applies to the 455 D control panel only. 

Page 27 

November, 2003 

400 Operator And  
455 D Control Panel Installation Manual  

Содержание 455 D

Страница 1: ...455 D Control Panel General Description 14 Installing the 455 D Control Panel 14 Connect the Main Power Supply 14 Connect the Operator to the Control Panel 15 Check the Motor s Direction of Rotation 1...

Страница 2: ...ons before the automatic operator is installed 4 An automatic operator should be installed on the inside of the property fence line Do not install the operator on the public side of the property fence...

Страница 3: ...mproper and therefore dangerous 2 When using any electrical equipment observe some fundamental rules Do not touch the equipment with damp or humid hands or feet Do not install or operate the equipment...

Страница 4: ...ened and or closed Operator dimensions l w h in cm 40 X 3 5 16 X 3 5 16 102 X 8 5 X 8 5 47 1 2 X 3 5 16 X 3 5 16 121 X 3 X 8 5 Operator weight lb kg 19 8 6 Power voltage required VAC7 115 VAC 10 60 Hz...

Страница 5: ...luded see Figure 1 If you have ordered a kit a pair of operators you will have twice the quantity of parts listed below except where noted and you will also have a radio receiver and two transmitters...

Страница 6: ...h the 400 Operator The Manual Release mechanism is a key operated device that disengages or engages the hydraulic system of the 400 Operator When the hydraulic system is disengaged you can open and cl...

Страница 7: ...g steps 1 Attach the rear mounting bracket 2 Attach the mounting hardware 3 Attach the front mounting bracket 4 Attach the operator to the gate 5 Adjust the operator pressure ATTACH THE REAR MOUNTING...

Страница 8: ...ately 6mm Note Be sure that the operator is level and that the gate is against the close positive stop Hold the front mounting bracket flush against the gate Mark the location of the front mounting br...

Страница 9: ...RNING The piston should not bottom out in either direction Doing so will seriously damage the operator Be sure that the gate reaches the positive stop before the piston bottoms out Adjust the swivel j...

Страница 10: ...ate the control panel in the most convenient position possible considering the movement of the gate Figure 7 shows a basic layout for a two leaf gate with the 400 Operator Installing the control panel...

Страница 11: ...the 400 operator should bleed itself Running the operator should remove any air from the system If the operator runs smooth throughout the swing no attempt to further bleed the unit is necessary If t...

Страница 12: ...Page 12 November 2003 400 Operator And 455 D Control Panel Installation Manual EXPLODED VIEW 400 CBAC...

Страница 13: ...2 36 7039025 Washer Swivel 1 37 702201 Swivel Jam Nut 10mm 1 38 7073025 Swivel Joint 1 39 N A Star Washer 5mm 2 POS PART NO DESCRIPTION QTY 40 7119405 Protective Cover End Cap Plug 2 41 7019195 Tie Ro...

Страница 14: ...cal codes The installer should refer to the installation manual for a given operator for more information NOTE An installation is U L compliant only when you install the FAAC operators according to th...

Страница 15: ...eaf gate design be sure to connect its operator to Motor 1 In order to wire motor 2 in a bi parting system connect the white wire to terminal 4 on the J4 terminal strip the black wire to 5 the red wir...

Страница 16: ...ain power and send an activating signal to the operator The gate leaf or leaves should open If a gate leaf closes then you need to turn off the main power and reverse the connection of the red and bla...

Страница 17: ...he respective terminals OP_A and OP_B Partial Opening should illuminate only when an activating signal is sent for 2 and 1 gate leaves respectively STOP should be illuminated except when the stop butt...

Страница 18: ...he delayed leaf closes at the end of the closing time Page 18 November 2003 400 Operator And 455 D Control Panel Installation Manual opening and closing respectively are triggered Use the LEDs and the...

Страница 19: ...17 Additional Reversing Devices TX RX 1 2 1 2 3 4 5 19 17 12 19 17 Additional Reversing Devices TX RX 1 2 19 12 17 15 Additional Reversing Devices 8 7 Saf ety Loop Detector f or closing 1 2 3 4 5 RX 1...

Страница 20: ...the value that can be modified with keys and When you reach the last function press the F key to exit the program and the display resumes showing the status of the inputs The table on page 9 shows the...

Страница 21: ...ns as a standard indicator light lighted at opening and pause flashing at closing and off when gate closed Different figures correspond to timed activation of the output which can be used via a relay...

Страница 22: ...leaves begin the opening movement The movement stops automatically when the opening positive stop is reached and the display stops flashing LEARNING OF OPERATING TIMES WARNING During the learning pro...

Страница 23: ...e gate operator reaches its positive stop the operator will automatically shut off An open command must be given to start closing gate operator 2 When gate operator 2 reaches the position that you wan...

Страница 24: ...g Reversing Device s Warning Light Closed Opens both leaves and closes them after pause time Opens single leaf connected to Motor 1 and closes it after pause time No effect No effect No effect Off Ope...

Страница 25: ...ens single leaf connected to Motor 1 No effect opening is in hibited No effect opening is inhibited No effect opening is inhibited Off Opening Stops Stops Stops Stops gate closes when reversing device...

Страница 26: ...tential of traffic getting backed up This distance is affected by the size of the gate how often it is used and how fast the gate operates The operator you choose to install on your gate must be desig...

Страница 27: ...your reversing devices If no reversing devices are installed make sure a circuit is installed between appropriate terminals PROBLEM THE GATE DOES NOT FULLY OPEN OR CLOSE SOLUTION Increase the bypass...

Страница 28: ...or has been subject to misuse negligence or accident or has not been operated in accordance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more sever...

Отзывы: