background image

Page 4 

November, 2003 

400 Operator And  

455 D Control Panel Installation Manual  

T

ECHNICAL

 D

ATA

 

  

400 Model 

Parameter 

Standard 

High Speed 

Slow Speed 

Long 

Model 

CBC

2

 

CBA

3

 

CBAC

4

 

SB

1

 

CBCR

2

 

CBAR

3

 

CBACR

4

 

SBS

1

 CBC

2

 

CBAC

4

 

Duty type 

Apartment, subdivision, industrial, and commercial applications 

Duty cycle 

80 Cycles/ Hour 

Maximum leaf length 

 ,    ft (m) 

18 (5.4) 

12 (3.6) 

20 (6) 

18 (5.4) 

Maximum leaf weight, lb (kg) 

1300 (600) 

900 (400) 

2000 (900) 

1300 (600) 

Maximum leaf swing, deg 

115 

125 

Thrust and traction, lb (kg) 

0–1760 (0–800) 

90 deg opening time, sec

6

 17 

12 23 

18 

Operating temperature range, deg F (deg C) 

-33 to 165   (-36 to 75) 

Thermal cut out, deg F (deg C) 

212    (100) 

Hydraulic locking 

Opened and/or closed 

None 

Opened and/or closed 

Operator dimensions,  
l ´ w ´ h, in. (cm) 

40 X 3 

5/16 

X 3 

5/16 

 

(102 X 8.5 X 8.5) 

47 

1/2 

X 3 

5/16

 X 3 

5/16

     

(121 X 3 X  8.5) 

Operator weight, lb (kg) 

19 (8.6) 

Power voltage required, VAC

7

 

115 VAC ±10%, 60 Hz, or 230 VAC +6 or -10%, 60 Hz 

Amp Draw 

115V = 1.5 Amps; 230V = 1 Amp 

Type of oil 

Lubrication Engineers - MONOLEC 6105 

Oil quantity, qt (l) 

1/3 

(2.2) 2 

7/8 

(2.7) 

The operator requires external locks. 

2  

Locks in the extended position. The hydraulic lock is a service device, not a security device. 

3  

Locks in the retracted position. The hydraulic lock is a service device, not a security device. 

4  

Locks in both the extended and retracted positions. The hydraulic lock is a service device, not a security device. 

5  

External locks are recommended if the gate leaves are 12 ft (3.6 m) or longer. 

6  

The time may vary ±10%. 

7       Your standard 220 VAC power source meets the specification for 230 VAC, +6 or -10%. 

Содержание 455 D

Страница 1: ...455 D Control Panel General Description 14 Installing the 455 D Control Panel 14 Connect the Main Power Supply 14 Connect the Operator to the Control Panel 15 Check the Motor s Direction of Rotation 1...

Страница 2: ...ons before the automatic operator is installed 4 An automatic operator should be installed on the inside of the property fence line Do not install the operator on the public side of the property fence...

Страница 3: ...mproper and therefore dangerous 2 When using any electrical equipment observe some fundamental rules Do not touch the equipment with damp or humid hands or feet Do not install or operate the equipment...

Страница 4: ...ened and or closed Operator dimensions l w h in cm 40 X 3 5 16 X 3 5 16 102 X 8 5 X 8 5 47 1 2 X 3 5 16 X 3 5 16 121 X 3 X 8 5 Operator weight lb kg 19 8 6 Power voltage required VAC7 115 VAC 10 60 Hz...

Страница 5: ...luded see Figure 1 If you have ordered a kit a pair of operators you will have twice the quantity of parts listed below except where noted and you will also have a radio receiver and two transmitters...

Страница 6: ...h the 400 Operator The Manual Release mechanism is a key operated device that disengages or engages the hydraulic system of the 400 Operator When the hydraulic system is disengaged you can open and cl...

Страница 7: ...g steps 1 Attach the rear mounting bracket 2 Attach the mounting hardware 3 Attach the front mounting bracket 4 Attach the operator to the gate 5 Adjust the operator pressure ATTACH THE REAR MOUNTING...

Страница 8: ...ately 6mm Note Be sure that the operator is level and that the gate is against the close positive stop Hold the front mounting bracket flush against the gate Mark the location of the front mounting br...

Страница 9: ...RNING The piston should not bottom out in either direction Doing so will seriously damage the operator Be sure that the gate reaches the positive stop before the piston bottoms out Adjust the swivel j...

Страница 10: ...ate the control panel in the most convenient position possible considering the movement of the gate Figure 7 shows a basic layout for a two leaf gate with the 400 Operator Installing the control panel...

Страница 11: ...the 400 operator should bleed itself Running the operator should remove any air from the system If the operator runs smooth throughout the swing no attempt to further bleed the unit is necessary If t...

Страница 12: ...Page 12 November 2003 400 Operator And 455 D Control Panel Installation Manual EXPLODED VIEW 400 CBAC...

Страница 13: ...2 36 7039025 Washer Swivel 1 37 702201 Swivel Jam Nut 10mm 1 38 7073025 Swivel Joint 1 39 N A Star Washer 5mm 2 POS PART NO DESCRIPTION QTY 40 7119405 Protective Cover End Cap Plug 2 41 7019195 Tie Ro...

Страница 14: ...cal codes The installer should refer to the installation manual for a given operator for more information NOTE An installation is U L compliant only when you install the FAAC operators according to th...

Страница 15: ...eaf gate design be sure to connect its operator to Motor 1 In order to wire motor 2 in a bi parting system connect the white wire to terminal 4 on the J4 terminal strip the black wire to 5 the red wir...

Страница 16: ...ain power and send an activating signal to the operator The gate leaf or leaves should open If a gate leaf closes then you need to turn off the main power and reverse the connection of the red and bla...

Страница 17: ...he respective terminals OP_A and OP_B Partial Opening should illuminate only when an activating signal is sent for 2 and 1 gate leaves respectively STOP should be illuminated except when the stop butt...

Страница 18: ...he delayed leaf closes at the end of the closing time Page 18 November 2003 400 Operator And 455 D Control Panel Installation Manual opening and closing respectively are triggered Use the LEDs and the...

Страница 19: ...17 Additional Reversing Devices TX RX 1 2 1 2 3 4 5 19 17 12 19 17 Additional Reversing Devices TX RX 1 2 19 12 17 15 Additional Reversing Devices 8 7 Saf ety Loop Detector f or closing 1 2 3 4 5 RX 1...

Страница 20: ...the value that can be modified with keys and When you reach the last function press the F key to exit the program and the display resumes showing the status of the inputs The table on page 9 shows the...

Страница 21: ...ns as a standard indicator light lighted at opening and pause flashing at closing and off when gate closed Different figures correspond to timed activation of the output which can be used via a relay...

Страница 22: ...leaves begin the opening movement The movement stops automatically when the opening positive stop is reached and the display stops flashing LEARNING OF OPERATING TIMES WARNING During the learning pro...

Страница 23: ...e gate operator reaches its positive stop the operator will automatically shut off An open command must be given to start closing gate operator 2 When gate operator 2 reaches the position that you wan...

Страница 24: ...g Reversing Device s Warning Light Closed Opens both leaves and closes them after pause time Opens single leaf connected to Motor 1 and closes it after pause time No effect No effect No effect Off Ope...

Страница 25: ...ens single leaf connected to Motor 1 No effect opening is in hibited No effect opening is inhibited No effect opening is inhibited Off Opening Stops Stops Stops Stops gate closes when reversing device...

Страница 26: ...tential of traffic getting backed up This distance is affected by the size of the gate how often it is used and how fast the gate operates The operator you choose to install on your gate must be desig...

Страница 27: ...your reversing devices If no reversing devices are installed make sure a circuit is installed between appropriate terminals PROBLEM THE GATE DOES NOT FULLY OPEN OR CLOSE SOLUTION Increase the bypass...

Страница 28: ...or has been subject to misuse negligence or accident or has not been operated in accordance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more sever...

Отзывы: