manualshive.com logo in svg
background image

 

20

Relay

24 VDC 

SPDT

Mag
Lock

+

NC

COM

LOCK

FSWTX W.LIGHT

30 Vcc

FSW

STOP

9      10     11   12   13    14   15    16   17    18   19   20   21    22   23    24   25

+

OP

CL

NC

B

A

+

+

 

Figure 20. Connect a mag lock to the 450 MPS 

with an external relay 

 
 
 

Warning Light

: Connect a warning light to terminals 

22 and 23 in the group labeled 

W.LIGHT

 in terminal 

block J3. The terminals provide an output voltage of 30 
VDC, maximum power 3 Watts. This output voltage 
will power most 24 VDC warning lights. 

Note

: The behavior of the warning light varies 

according to the logic you have set. 

Logics A, S, E, EP, and B

: The warning light is 

on steadily during opening and the pause phase. 
During closing, the light flashes. 
 

Logic C

: The warning light is on steadily during 

opening and flashes during closing. 

Set Operating Controls 

WARNING

! Turn off the main power before 

you make any electrical connections or set any 
switches inside the control panel box. 

Note

: Some DIP switch assemblies are labeled 

differently depending on their date of 
manufacture. OPEN indicates 

off

 and ON 

indicates 

on

You need to set DIP switches and adjust some 
potentiometers on the control panel for your gate's 
operation. The 450 MPS Control Panel has 5 DIP 
switches and 4 potentiometers that control a wide range 
of functions. 

Set DIP Switches 

Switches 1, 2, and 3 (Operating Logic)  

The 450 MPS Control Panel offers six operating modes: 
A, S, E, EP, B, and C. B and C logic are appropriate for 
guard station applications of the 412 Operator. 

Refer to the operating logic tables earlier in these 
instructions for more detail. 
 
Switches 1, 2, and 3 control the operating logic 

according to the following scheme:  

 

 

Switch 

Logic 

1 2 3 

A  off off off 

S on off off 

E  off on off 

EP on on off 

B  on on on 
C off off on 

Switch 4 (Reversing Device  
Behavior on Closing)  

Refer to the operating logic tables earlier in this manual 
and to the chart below for how to set DIP switch 4. 
 

Gate Behavior 

During Closing 

Switch 4 

Gate immediately 
reverses its direction 
when a reversing device 
is triggered 

off 

Gate stops and reverse its 
direction when reversing 
device is no longer 
triggered 

on 

Switch 5 (Reversing Stroke)  

Some electric locks require a reversing stroke to 
disengage the lock. If your lock requires this reversing 
stroke, set DIP switch 5 according to the following 
chart. 
 

Reversing Stroke 

Switch 5 

Not activated 

off 

Activated on 

Adjust the Potentiometers 

The four potentiometers control the torque, the pause 
time between opening and closing, the opening/closing 
time of operation, and the leaf delay on closing. 

Содержание 412 Compact

Страница 1: ...ate Leaf 10 Attach the Rear Mounting Bracket 10 Attach the Operator to the Rear Mounting Bracket 12 Attach the Operator to the Front Mounting Bracket 12 Attach the Front Mounting Bracket to the Gate L...

Страница 2: ...ortant that you locate the gate far enough away from the road to eliminate the potential of traffic getting backed up This distance is affected by the size of the gate how often it is used and how fas...

Страница 3: ...al equipment observe some fundamental rules Do not touch the equipment with damp or humid hands or feet Do not install or operate the equipment with bare feet Do not allow small children or incapable...

Страница 4: ...may affect duty cycle 4 The 90 deg opening time for a gate with the 412 Operator is a maximum of about 46 sec Note that both the mounting dimensions and the torque adjustment help to determine the pr...

Страница 5: ...is marked SX and one is marked DX Be sure to install each on the proper gate leaf see Figure 2 2 Protective covers for the worm screw housing of the operator 1 Package of mounting hardware 2 Rear mou...

Страница 6: ...on the single phase bidirectional motor shuts off automatically if its operating temperature reaches 284 deg F 140 deg C Also for the protection and proper operation of the 412 Operator each gate leaf...

Страница 7: ...e 450 MPS control panel are briefly described below You can find a complete description of each logic in the tables on the following pages A automatic The gate opens on command and automatically close...

Страница 8: ...them after pause time Opens single leaf connected to Motor 1 and closes it after pause time No effect No effect No effect Off Opening Closes both leaves immediately Closes the leaf immediately Stops S...

Страница 9: ...1 No effect opening is inhibited No effect opening is inhibited No effect opening is inhibited Off Opening Stops Stops Stops Stops gate closes when reversing device no longer triggered No effect On O...

Страница 10: ...Installing the operator consists of the following steps Establishing the orientation of each gate leaf and its operator Attaching the rear mounting bracket Attaching the operator to the rear mounting...

Страница 11: ...acket see Figure 6 The recessed liner should be constructed of 3 16 or 1 4 in steel with a minimum interior height of 11 13 16 in 30 cm so as to allow you to meet the required dimensions shown in Figu...

Страница 12: ...gate installation Inward swinging Lengthen the worm screw completely and push the cylinder in one inch Outward swinging Shorten the worm screw completely and then pull the cylinder out one inch With t...

Страница 13: ...unting plate to the center of the front mounting hole on the operator Figure 9 Secure the operator to the front mounting bracket with the short pin and 2 snap rings dimensions are incorrect see Figure...

Страница 14: ...WARNING The voltage of the main power must match the required voltage of the 412 Operator and the 450 MPS control panel Wire the main power supply to control panel terminals in block J1 see Figures 13...

Страница 15: ...the control panel enclosure For the purposes of installation you need to connect at least one normally open N O activating device for your operator s If you have a two leaf gate design connect the ac...

Страница 16: ...Listed cord grip Junction box Op 1 Op 2 1 2 3 4 5 6 7 8 OP COM CL CL COM OP Lamp Motor 1 Motor 2 J1 J2 High voltage terminal strip 450 MPS Control Panel U L Listed Control Panel Enclosure Cord grip or...

Страница 17: ...tially dangerous Do not place yourself within the path of the moving gate during your test Disengage the operator s with the Manual Release key and open the gate by hand about halfway Next engage the...

Страница 18: ...on terminal block J3 requires a fail safe connection for the photocells Connect the photocells to terminals 20 and 21 in the FSWTX grouping Activating Devices and Radio Receiver The acti vating device...

Страница 19: ...button you must install a circuit between these terminals for the control panel to work The LED Indicators The five light emitting diodes LEDs on the control panel can be used to check for the proper...

Страница 20: ...ol Panel has 5 DIP switches and 4 potentiometers that control a wide range of functions Set DIP Switches Switches 1 2 and 3 Operating Logic The 450 MPS Control Panel offers six operating modes A S E E...

Страница 21: ...5 sec Note You cannot adjust this opening delay of the operator connected to Motor 2 However you can avoid the opening delay and closing delay by connecting both operators and their capacitors to Mot...

Страница 22: ...k J3 Check the LED DL1 for a two leaf gate or DL2 for a one leaf gate One of them should turn on when you signal the gate to open or to close If neither one illuminates then check the wiring for the a...

Страница 23: ...negligence or accident or has not been operated in accordance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more severe than or otherwise exceeding...

Отзывы: