background image

1

TLP Pro 725C Series • Setup Guide

Overview

The Extron TLP Pro 725C is a 7 inch Cable Cubby touchpanel with a flip-up, 1024x600 (WSVGA) LCD touchscreen with 
24-bit color depth. The TLP Pro 725C NC is a streamlined version of the touchpanel, with a set of features designed to adhere 
to government and military security protocols. Either model is ideal for any AV application requiring a full-size, Cable Cubby 
touchpanel with a customizable interface. This guide provides instructions for experienced installers to mount and install the 
TLP Pro 725C series touchpanels. For more complete instructions, see the 

TLP Pro 725C User Guide

, at 

www.extron.com

.

Setup Checklist

Get Ready

 

…

Download and install the latest version of the following software:

 

…

GUI Designer

 — For designing layouts for Extron TouchLink

®

 Pro touchpanels and third party touch interfaces. 

 

…

Global Configurator

®

 Professional and Global Configurator Plus

 — For setting up and configuring the control 

processor and touchpanel.

 

…

Toolbelt

 — Provides device discovery, device information, firmware updates, and configuration of network settings, 

system utilities, and user management for TouchLink Pro devices.

 

…

Global Scripter

®

 — Provides an integrated development environment for Extron control systems programming.

NOTE:

  All four software programs are available from 

www.extron.com

.

 

…

Obtain the following network information from your network administrator:

 

…

DHCP status

 — (on or off). If DHCP is off, you must also obtain:

 

…

IP address 

 

…

Subnet mask

 

…

Gateway

 

…

User name

 — This can be either 

admin

 or 

user

.

 

…

Password

  — By default, this is 

extron

 (for either admin or user).

 

…

Make a note of the touchpanel MAC address.

 

…

Make sure you are familiar with all the included parts and have all the necessary tools (see page 2) for installing the cable 
cubby.

Included Parts

Check that all the following parts are included when the touchpanel is received.

TLP Pro 725C (1)

#4-40 Screw (8)

#6-32 Screw (8)

#6 Star Washer (8)

3/8” Hole Plug (12)

1/4” Hole Plug (4)

8-cable Cable

Pass-through Plate (2)

3-space

AAP Frame (2)

3-space

Connectivity

Bracket (2)

Figure 1. 

Included Parts (and Number Provided)

NOTE:

 

Active or Passive AAPs must be purchased separately (

www.extron.com

).

Содержание TouchLink TLP Pro 725C Series

Страница 1: ...el Toolbelt Provides device discovery device information firmware updates and configuration of network settings system utilities and user management for TouchLink Pro devices Global Scripter Provides an integrated development environment for Extron control systems programming NOTE All four software programs are available from www extron com Obtain the following network information from your networ...

Страница 2: ...tor to the LAN and power it on see figure 9 Set up the Touchpanels for Network Communication Connect the PC that you are using for setup the control processor and the touchpanel to the same Ethernet subnetwork Use the Setup Menu see page 8 or Toolbelt to set the DHCP status and if necessary the IP address subnet mask gateway and related settings for the touchpanel Configure the Touchpanels The GUI...

Страница 3: ...C Series User Guide There are three methods for cutting the hole in the table Using a hand router Recommended method Use the Extron TLP Pro 725C routing template see Installation Routing Templates for Cable Cubby Series 2 Enclosures at www extron com Refer to the Routing Template User Guide available at www extron com to prepare the template and use the template to cut the hole NOTE The metal rout...

Страница 4: ...Guide and Retractors User Guide at www extron com Step 5 Assemble Pass through Cable Module Optional 1 Pass the cables through the connectivity module from the bottom see figure 5 1 2 Insert the cable into the grommet plate 2 3 Fill any unused holes with the provided plugs 3 4 Attach the grommet plate to the top of the connectivity module using four of the provided 4 40 thread forming screws 4 To ...

Страница 5: ...on secteur autre que le modèle Cable Cubby AC Power Module To install the power cable pass through or AAP modules follow these instructions 1 Insert the module into the cable cubby figure 7 1 Make sure the mounting holes on the module line up with the holes on the Cable Cubby enclosure If you are installing retractors they should be secured using the lowest level of mounting holes inside the touch...

Страница 6: ...d and ensure that the lever is down Slide the clamp all the way up against the bottom of the table Ensure the TLP Pro 725C is firmly seated in the table Rotate the lever up to secure the enclosure 2 1 3 Lever Figure 8 Mounting the TLP Pro 725C Enclosure Locking Plate NOTE To lower the side clamp turn the lever down then press and hold the locking plate while sliding down the clamp 2 Rotate the sid...

Страница 7: ...l and at least 15 from the center axis When no motion has been detected for a user defined period of time the touchpanel enters sleep mode When motion is detected by the sensor the screen display is restored and active C Communication LED This LED shows the configuration and connection status of the touchpanel Unlit during normal operation the touchpanel is configured and connected to an IP Link P...

Страница 8: ... to the unit Use this mode with Toolbelt software to replace firmware in the event of conflicts arising from uploading a firmware update Reset All IP Settings Press and hold the Reset button for 6 seconds After the Reset LED C flashes twice release and momentarily press the Reset button Use this mode to reset all network settings without affecting user loaded files Reset to Factory Defaults Press ...

Отзывы: