3.
Mount and cable the units:
ATTENTION:
•
Do not power on the touchpanels or control processors until you have read the
Attention
about Power over Ethernet (PoE) power supplies (see page 17).
•
Ne branchez pas les écrans tactiles ou les processeurs de contrôle avant d’avoir lu
la
mise en garde
sur les sources d’alimentation via Ethernet (PoE) (voir page 17).
Mount the units.
NOTE:
If you use the setup menu to configure the TLP Pro 725C (see step 4,
below), configure the touchpanel before mounting as you will need access to the
Menu
button, which is under the table on the unit base.
Connect cables to the touchpanels (see
TLP Pro 725C Base Features
on page 17).
Connect the power cords and power on all devices.
4.
Set up the touchpanels for network communication:
Connect the PC that you are using for setup, the Extron control processor, and the
touchpanel to the same Ethernet subnetwork.
Use the
Setup Menu
(see page 19) or Toolbelt to set the DHCP status and, if
required, the IP address, subnet mask, gateway, and related settings for the touchpanel.
5.
Configure the TLP Pro touchpanels — the
GUI Designer Help File,
the
Global Configurator
Help File
, and the
Toolbelt Help File
provide step-by-step instructions and detailed
information.
The
Global Configurator Help File
also includes an introduction to that software and sections
on how to start a project and configuration.
Global Scripter provides an Extron-exclusive Python library (ControlScript) and
Global Scripter modules to get you started. See the
GlobalScripter Help File
for more
information.
TLP Pro 725C Series Touchpanels • Installation Overview
5
Содержание TouchLink TLP Pro 725C NC
Страница 10: ...TLP Pro 725C Series Touchpanels Contents x ...