21
ENGLISH
GENERAL MENU
KEY
FUNCTION
OK
OK
Scroll parameters
Modify settings
OK
Ignition - switch-off key
KEY
FUNCTION
Back - exit key
OK
Access menu key
FRONT AIR
SET
EASY SETUP
CHRONO
ENABLING
PRG1
PRG2
SETTINGS
DATE-TIME
PRG3
LANGUAGE
PRG4
DISPLAY
STAND BY
DELTA T
FIRST LOAD
CLEANING
*STOVE STATUS
DEGREES
RESET
* TECHNICIANS ONLY
EASY CONTROL
* TECH MENU
DEPRESSURE
NOTICE
GENERAL WARNINGS
Advice to follow for the first start-ups of the product:
During the first hours of operation, there may be some smoke or
odours, but they are due to the normal “thermal break-in” process.
During this process, the duration of which changes depending on the
product, it is recommended to:
Ventilate the room well
If present, remove any majolica or natural stone parts from the
top part of the product
Activate the product at the maximum power and temperature
Avoid remaining in the room for a long time
Do not touch the surfaces of the product
Notes:
The process is completed after a few heating/cooling cycles.
Do not use for the combustion of elements or substances other than
those indicated in the manual.
Before turning on the product, it is necessary to perform the
following checks:
If it is intended to be connected to a hydraulic system, it must
be complete and fully functional and in compliance with the
instructions given in the product manual and with the relevant
regulations in force.
The pellet hopper must be completed loaded
The combustion chamber and the burn pot must be clean
Make sure that the fire holder, the ash pan and the pellet
hopper close hermetically (if present in the hermetic version); they
must be closed and there must be no foreign bodies in the sealing
elements and gaskets.
Check that the power cord is properly connected
The bipolar switch (if present) must be set to position “1”.