Section 7: Commissioning

Commissioning the System

Note: The steps 11 and 15 to 21 represent detailed commissioning tests

The following equipment is needed for this process:
• Continuity meter
• Gauge manometer (0 to 200 mbarg)
• Differential manometer
If, after commissioning, the system does not perform as expected, refer to the 

Fault Finding 

Section.

Follow the steps as outlined:
1. Check all connections and that the Relief Valve Unit is fitted correctly with an unobstructed path to the purge

exhaust.

2. Close the Purge Flow Restrictor Valve.
3. Fully open external supply shut-off valve where fitted.
4. Check that the internal logic pressure gauge reads 2.3 barg / 33 psi / 230 kPag.
5. Check that the pressure gauge on main air supply reads 5 barg / 73 psi / 500 kPag.
6. Check that the Pressure Relief Valve is correctly set by disconnecting the minimum pressure sensing pipe at 

the bulkhead fitting on the input to the MiniPurge

®

. This will disable all of the pressure sensors.

•  Using a 4 mm nylon tube, connect a manometer to the bulkhead fitting from which the minimum pressure 
sensing pipe was removed.
•  Open the Purge Flow Restrictor Valve very slowly, until the Pressure Relief Valve opens 
•  Check the opening pressure is within calibration limits. 
•  This test can be carried out several times to ensure repeatability and compliance.
Refer to the 

Maintenance of the System

 section if the Relief Valve needs recalibrating.

7. Close the Purge Flow Restrictor Valve.
8. Remove the manometer and reconnect the minimum pressure sensing pipe to the bulkhead fitting.
9. Remove red plug from the top of the Minimum Pressure Sensor and connect a gauge manometer.
10.Connect a differential manometer to the test points on the flow sensor.

11.To check sensor calibration

•  The internal pressure in the pressurized enclosure must be below Relief Valve lift off pressure and above 
the CLAPS pressure
•  At this time the pressurized indicator should be 

green

.

•  gradually open Purge Flow Restrictor Valve until purging indicator 

flashes

 

yellow

.

Note: For large volumes it may take a long time for the purge flow to start.

•  very slowly close Purge Flow Restrictor Valve until the purging indicator stops 

flashing yellow.

•  Take a reading from pressure gauge.

12.To set the purge flow rate:

•  Turn on the compressed air to the MiniPurge

®

.

•  Gradually open the Purge Flow Restrictor Valve until the 

black / yellow

 indicator changes to 

yellow 

(flashing)

•  The flashing yellow indicator confirms the correct flow rate.
•  The differential pressure should be greater than 6.4 mbarg.

Содержание ML384

Страница 1: ...llow these instructions Please refer to the standard for principles and definition These instructions apply only to the pressurizing system it is the responsibility of the manufacturer of the pressuri...

Страница 2: ......

Страница 3: ...rminal Box 11 Section 6 Installation of the System 12 Relief Valve Unit 12 Air Supply Quality 12 Pipe Work 13 Multiple Enclosures 13 Provision and Installation of Alarm Devices 13 Power Supplies and t...

Страница 4: ...b 20 C to 55 C T V 12 1462X Ex pxb ia IIC T6 Gb Ex pxb ia IIIC T95 C Db Tamb 20 C to 55 C OV Purge Outlet Valve is pneumatically operated IS Intrinsically Safe Power Alarm terminal box Timing Method E...

Страница 5: ...nts signals 1 8 NPT female minimum 6 mm pipe to be used Visual Indicators Alarm Red Pressurized Green System Purging 4 LEDs that flash sequentially to indicate elapsed time black when not purging IS T...

Страница 6: ...te intervals up to 99 minutes tolerance 0 3 seconds Default Setting 99 minutes Weight 27 kg 60lb Type RLV104 ss FS Design number D758RLV Bore Purge Outlet Valve 104 mm Relief Valve 75 mm Relief Valve...

Страница 7: ...air supply pres sure during the purge process Operation of the System Once the system is installed correctly turn on the air supply Refer to Commissioning section The purge system commences the purge...

Страница 8: ...ver be less than the required purge time The system is now operating correctly in leakage compensation mode If the system has not performed as expected check the installation thoroughly and ensure it...

Страница 9: ...switching devices may be limited in their gas group The certification documentation supplied with any such devices must be checked to ensure their suitability This system is primarily designed for use...

Страница 10: ...entered the enclosure before pressurization Purging is the process of removal contaminated air and replacement with air or inert gas known to be free from flammable gas The duration of this purge proc...

Страница 11: ...ower Interlock switch Alarm Trip Purge Time Machinery Start Normal Operation CLAPS Regulator Pressure Intermediate switch contacts open Intermediate sensor sends falling pressure signal Fault Conditio...

Страница 12: ...m specified pressure Purge Flow Sensor The Purge Flow Sensor monitors flow through the Purge Outlet Valve At correct purge flow rates above the minimum specified for purging the sensor sends a signal...

Страница 13: ...ntially dangerous to energise the pressurized enclosure in an non pressurized condition when it is known that there is potentially explosive gas or dust in the hazardous location Visual Indicators Vis...

Страница 14: ...controls the leakage compensation air flow into the enclosure after the purging is complete It either increases or decreases the air flow into the enclosure as appropriate to maintain a stable runnin...

Страница 15: ...might affect the calibration of the device In particular the exterior of the spark arrestor should not be painted or blocked in any way Air Supply Quality The MiniPurge system should be connected to...

Страница 16: ...above the minimum the Minimum Pressure Sensor re turns a positive pressurized signal causing the alarm indicator on the control unit to change from red to green When the pressure falls below the minim...

Страница 17: ...all screws in the terminals are secure In all cases the application and isolation of power must be controlled by the MiniPurge system using the power interlock signal No switches are permitted between...

Страница 18: ...e minimum pressure sensing pipe was removed Open the Purge Flow Restrictor Valve very slowly until the Pressure Relief Valve opens Check the opening pressure is within calibration limits This test can...

Страница 19: ...check readings on manometer as system will automatically re purge when it reaches minimum pressure 20 While the system re purges return the CLAPS Regulator to the initial setting 21 If minimum pressu...

Страница 20: ...ation There are no unauthorised modifications The air supply is uncontaminated The interlocks and alarms function correctly Approval labels are legible and undamaged Adequate spares are carried The ac...

Страница 21: ...nsitive and it is recommended that a 1 4 turn maximum adjustments are applied between tests Re calibration of the Pressure Sensors The brass nozzle on the sensor is sealed into position using Loctite...

Страница 22: ...designed for ease of fault finding and many of the components fitted are plug in or chassis mounted Check components by substitution only after establishing that such action is necessary Before carryi...

Страница 23: ...n the supply pipe Static pressure of 5 barg must be maintained during purge Check air supply pressure at the inlet to the control unit Ensure that the supply pipe bore is suitable for the flow rate Pr...

Страница 24: ...as stated on the Customer Test and Inspection Sheet S0015 018 Pressure gauge Air Supply Pressure 0 10 barg S0015 135 Miniature gauge Logic Pressure 0 4 barg ETM IS31 001 IS battery pack for electronic...

Страница 25: ...system merely tops up for any enclosure leakage The system provides an initial high flow of purging air that leaves the PE through the Relief Valve After the initial purging has been completed the Co...

Страница 26: ...one PE can be protected by a single system If PEs are connected and purged in series e g Daisy Chained the Outlet Orifice must be fitted on the last enclosure with the Purge Inlet to the first enclosu...

Страница 27: ...ally by the user by the use of local isolating switch 1 4 2 In accordance with NFPA 496 Expo Mini X Purge systems can have the Action on Pressure Failure normally Alarm and Trip adjusted by the user t...

Страница 28: ...ation do not confuse this flow rate with that caused by excessive setting of the LCV Close the LCV slowly observing the manometer or gauge see item 2 1 3 above The PE pressure will start to fall as th...

Страница 29: ...quantity The LCV is too far open and the air flow is holding the RLV open continuously Note Some CFHP systems have a deliberate but modest Continuous air flow through the RLV in normal operation do n...

Страница 30: ...in the air supply For this reason a dust and water filter should always be fitted But debris can enter from other sources and it is vital therefore that the procedures described in Section 2 is carrie...

Страница 31: ...d Is the pipe to the Power Switch airtight The signal to the Power Switch bulkhead has a restrictor that limits the permissible leakage from the pipe e Note the timer setting Reset the timer to the m...

Страница 32: ...e com Appendix A Certifications Download the certificates at www expoworldwide com downloads Component Certificate Number Purge System ATEX Certificate SIRA 01ATEX1295X IECEx Certificate IECEx SIR07 0...

Страница 33: ...7 6 29 3 32 3 57 2 027256 6 5 9 02 180 5 33529 7 33529 5 1 0 41 0 0 7 5 6 6 67 0 286 1 67 1 66 67 H 81 7 21 2 67 1 66 67 8 77 1 6 67 1 66 67 72 5 1 81 66 67 7 27 5 6 0 7 5 6 6 127 6 UG 1 352 7 21 0 16...

Страница 34: ...50 7 6 7 78 725 17 50 7 6 7 9 6312 G 7521 385 7 0 5 6 77 5 3 1 725 50 35 6685 1 725 6 67 0 385 1 0 1 385 28 1 725 81 7 21 2 25 175 16 6 5 8 76 21 0 1 080 3 0 1 385 57 7 21 77 16 225 7521 7 0 5 72 5 1...

Страница 35: ...d NOTE LC BOOST system is optional LC BOOST 71 66 72 66 7 1 PP 29 5 1 PP 1 7 8163 72 5 1 6 0 7 5 5 1 67 786 33529 02 1R 7 668 UG 1 352 7 21 0 16 216 1 PP 2 127 6 SR 7HFKQRORJLHV LPLWHG 2 1R 1 6 7 7 86...

Страница 36: ...RM 1 8 NPT 1 8 NPT 1 4 6mm I D 1 4 6mm I D 1 NPT PI H CONNECT TO EITHER A OR B 1 2 NPT 1 2 NPT A B 1 25mm I D MINIMUM 1 8 NPT 1 8 NPT 1 8 NPT ELECTRICAL SIGNAL VIA EEx e JUNCTION BOX RECOMMENDED MINIM...

Страница 37: ......

Страница 38: ...09 110 111 112 113 114 115 116 117 118 BLACK GREY BROWN BLACK GREY BROWN GREY BLACK BLUE BROWN TERMINAL LAYOUT INTERMEDIATE PRESSURE CONTACTS SEE CIRCUIT DIAGRAM ALARM PRESSURISED CONTACTS MOTOR INTER...

Страница 39: ......

Страница 40: ...N O T S C A L E SR 7HFKQRORJLHV LPLWHG JOB No FINISH TITLE CUSTOMER SHEET No O F PROJECTION D I M E N S I O N S I N m m 81 7 1 20 DRAWING No 1 NRB from Expo Technologies Limited neither are they to b...

Страница 41: ...Pressure Equipment Directive 97 23 EC MiniPurge Systems are classified as not higher than category I under Article 9 of this Directive and intended for use in potentially explosive atmospheres Hazard...

Страница 42: ......

Страница 43: ......

Страница 44: ...ologies Ltd Unit 2 The Summit Hanworth Road Sunbury on Thames TW16 5DB UK Tel 44 0 20 8398 8011 Fax 44 0 20 8398 8014 E mail sales expoworldwide com Qingdao Expo M E Technologies Co Ltd 329 Huashan Er...

Отзывы: