![Evco Vcolor 679 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/evco/vcolor-679/vcolor-679_installer-manual_2441855014.webp)
EVCO S.p.A.
Vcolor 679/689
| Installer manual ver. 1.0 | Code 144VC679E104
page
14
of
70
4
RETARDING-PROOFING OR PROOFING OPERATION
4.1
Initial information
Vcolor 679/689 is a controller which, by simply setting a parameter, can be configured to manage retarding-proofing cabinets and
rooms (E12 = 1) or proofing cabinets and rooms (E12 = 0). All the cooling regulations are for retarding-proofing only; care must
therefore be taken when configuring the controller for proofing (E12 = 0), that no parameters are set for cooling (see section
14.
PARAMETERS
).
Automatic management of the complete dough cycle consists of three phases in the proofing configuration (re-awakening, proofing and
baking delay), plus two more for retarding-proofing (blocking and holding). There are also manual cycles such as heating for proofing
and cooling/pre-cooling/heating for retarding-proofing.
This manual gives instructions how to use the controller, only pointing out when there are differences between the two configurations.
5
FIRST-TIME USE
5.1
Operating modes
The controller has the following operating modes:
- “OFF” (no power to the device);
- “STAND-BY” (the device is powered but switched off);
- “ON/HOME” (the device is powered, switched on and awaiting start-up of an operating cycle);
- “RUN” (the device is powered, switched on and running an operating cycle).
Terminology: “device switch-on” means going from “stand-by” to “ON” and “device switch-off” from “ON” to “stand-by”.
If there is a power outage, when power is restored the device will return to the mode set before the failure.
5.2
Operating the device
Follow these instructions to operate the device:
1.
Install the device as shown in section 2 “MEASUREMENTS AND INSTALLATION”, taking all the precautions mentioned in
paragraph 2.6 “Installation precautions”.
2.
Make the electrical connection as shown in section 3 “ELECTRICAL CONNECTION”, taking all the precautions mentioned in
paragraph 3.3 “Precautions for electrical connection”.
3.
Connect the power supply to the device: the device will show a splash screen for 10 seconds.
Once loading is complete, the device will display the mode it was in before being powered down:
- stand-by screen, press the central area to move to the Home screen;
- the Home screen.
Splash screen
Stand-by screen