10
CHECK ON RECEIPT
CHECK ON RECEIPT
MAIN CHARACTERISTICS
Upon receiving the unit carefully check that the load matches that ordered, to ensure that the delivery is complete .
Carefully check for any damage . In case of goods with visible damage, promptly report to the carrier, specifying on
the bill the words “Collection subject to verification due to obvious damage" . Delivery ex works involves compensation
of damage payable by insurance as required by the regulations .
Before starting unit handling operations, check the
weight of the unit on the dataplate and also in the
technical documentation . Make sure the unit is handled
carefully without bumping, in order to avoid damaging the
machine's functional parts. All the information necessary
for proper handling during storage and installation is given
on the packing . It is advisable to keep the unit in its original
packing until installed in the required place, especially in
the case of a worksite . The unit comes on a pallet arranged
for transport . It is advisable to place a suitable separation
between the lift truck and unit to prevent damage to the
unit . Make sure the unit or any parts of it cannot fall on
the ground .
ATTENTION! The unit should be handled and stored in an upright position . Transport in a tilted position
is allowed only for brief sections and only placed on its side, keeping the compressor at the top; in this
case wait at least 3 hours before starting the unit already correctly repositioned upright (in order to ensure
adequate provision of oil inside the refrigerant circuit and prevent damage to the compressor) .
Fig .1