background image

www.etsnord.com

4

®

RDM-31-0322

NORD

canopy

  

 

|

   

OZ 3.1 Installation Guide

1.  Check the product shipment

Check that the parcel contains all components listed below and that there is no visible damage. 

Notify both the freight forwarder and supplier immediately of any damage or missing components.   

Before installing the device read through the entire instruction material.

The Ozone Cleaning System consists of two key components:

 

- One or more Ozone Modules

 

- Control Panel

Each OZ 3.1 package contains:

 

- OZ 3.1 Ozone Module

 

- Short pressure measurement hose (60cm)

 

- Long pressure measurement hose (3.5m)

 

- Power cable with IEC C13 plug (3m)

The Control Panel package contains:

 

- Control Panel

 

- One sheet of Ozone Module device address identification labels

There is typically one Control Panel for each kitchen. The number of Ozone Modules is dependent on the design of 

the kitchen and the canopy as well as the equipment used for cooking. This is decided when planning the kitchen. 

2.  System overview

The Ozone Modules produces ozone gas. Ozone (O3) is a very effective oxidant, and when mixed into a kitchen 

exhaust airstream it breaks down grease and odor particles to water vapor, carbon dioxide and dry minerals, 

all natural products of oxidation which exit the exhaust system

.

.

NOTE

 For best results with odor reduction, the reaction time for ozone within a kitchen exhaust system 

should be at least two seconds. However, longer exposure can further improve results. This time 

should be taken into account during the design phase of the kitchen exhaust system.

8

5

7

6

2

4

3

1

1  –  

Canopy

2  –  Ozone duct Ø100 mm
3  –  Ozone Module
4  –  Bend Ø100 mm 90° (AISI 316)

5  –  Data connector (ModBus, BACnet)
6  –  Ozone Module suspension clamps
7  –  Ambient air pressure nozzle
8  –  Power plug socket for IEC C13 plug

Содержание NORDcanopy OZ 3.1

Страница 1: ...NORDcanopy OZ 3 1 Ozone Cleaning System Installation Guide...

Страница 2: ...the device addresses 5 4 Installation 6 4 1 General information 6 4 2 Connect the pressure measurement hoses 7 4 3 Mount the Control Panel 8 5 Electrical Installation 9 5 1 Connect the main electrical...

Страница 3: ...one O3 Ozone significantly reduces odor grease mold and bacteria ETS NORD AS disclaims any liability in the case that the product is not used in accordance with the manufacturer s instructions contain...

Страница 4: ...ch kitchen The number of Ozone Modules is dependent on the design of the kitchen and the canopy as well as the equipment used for cooking This is decided when planning the kitchen 2 System overview Th...

Страница 5: ...ontrol Panel and increasing by one for each sequential module The first connected Ozone Module should have the address 1 Example Ozone Module one Adress 1 Switch 1x 1 Switch 10x 0 Ozone Module thirtee...

Страница 6: ...facturer s drawings The ozone duct must be made of acid resistant stainless steel AISI 316 Before starting the Ozone Module check visually that all ozone duct connections are airtight Always leave a m...

Страница 7: ...module Feed the long hose through the 100mm ozone duct into the exhaust chamber While lifting the module into place securely attach one end of the hose to the hose located in the Ozone Module 100mm fl...

Страница 8: ...it near any sources of moisture or heat The housing must be disassembled into three parts Remove the two fixing screws on the sides of the case Before mounting the backplate apply an even strip of wa...

Страница 9: ...lied to the ozone system See the sample diagram below as one possible option to accomplish this function A maximum of 4 Ozone Modules and one alarm panel may be connected a single 10A C type slow circ...

Страница 10: ...r the rear wall or the cable bushings in the bottom of the case Connect the 230V supply cable to the power supply terminals L N and PE as shown in the diagram Each Ozone Module has its own power cable...

Страница 11: ...format That is similar terminals between devices are connected together there are no specific in or out data terminals on the various components Maximum limit for the number of Ozone Module connected...

Страница 12: ...of any Ozone Module in the chain should share the same terminal screw in its respective connector In this way the three extra unused terminals just below on the connector block can be reserved for fu...

Страница 13: ...ard as seen below LAN cable must be connected to a network switch or to the closest LAN socket Reassemble the housing in reverse order with the smaller LED display above the larger one Ensure the text...

Страница 14: ...ction chamber of the canopy and that the bottom edges of all filters do not have any gaps Call service is lit is red This indicates a technical fault has been detected in the system Contact your ETS N...

Страница 15: ...the initial commissioning of the device has been performed by an authorized partner of ETS NORD AS the equipment is serviced every 12 months after commissioning specified components eg ozone generatin...

Страница 16: ...etsnord ee ETS NORD Finland Address Pakkasraitti 4 04360 Tuusula Finland Phone 358 401 842 842 info etsnord fi www etsnord fi ETS NORD Sweden Address J rsj gatan 7 69235 Kumla Sweden Phone 46 19 554...

Отзывы: