Install Rack Options
27
2:
Install the Unison BatteryPack on to the bottom of the ERn enclosure as pictured below.
a: Insert the tabs from the UBPO into the slots in the ERn enclosure.
b: Secure the UBPO to the ERn enclosure using the screw provided.
Note:
As the BatteryPack is mated to the rack, the connector on the BatteryPack and the
connector receptacle installed in step 1a also mate.
See note after 2a:
Step 2a:
Step 2b: