Installation
Removing panels
41
Fig. 9-3: Compensating shims
Adjusting the height of the ash box
Set the height of the attached ash box with the levelling
feet on the bottom, so that the ash box lies evenly on
the floor.
Fig. 9-4: Levelling feet
9.2
Removing panels
Removing the cover
Remove the cover from the top of the boiler.
Fig. 9-5: Cover
Removing the side cover
Remove the side cover.
Fig. 9-6: Side cover
Removing the cover for the circuit boards
Open the boiler door and remove the cover over the
circuit boards.
Fig. 9-7: Cover
Содержание PelletsCompact PC33
Страница 1: ...2020 07 21 EN 0000000171 V 025 2707 93113 005 PelletsCompact 33 50 kW Installation...
Страница 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33...
Страница 51: ...Installation Network connection 51...
Страница 55: ...Electrical connections Overview of circuit boards 55...
Страница 74: ...www eta co at...
Страница 75: ......
Страница 76: ...www eta co at www eta co at downloads DOWNLOAD...