18
www.eta.co.at
Chimney
Information for installation
7
Information for installation
7.1
Chimney
7.1.1
Planning and layout
Required chimney diameter
Please note that in partial-load operation the exhaust temperature is lower and the large chimney diameters,
normally used for solid fuel, are no longer ideal. If the cross section is too large, the flue gas no longer safely rises
from the chimney opening and may flow along the roof and sink to the windows of the living quarters.
The flue gas connection on the boiler has two different diameters (see table). The flue pipe from boiler to
chimney must be executed as per the requirements in the table. A flue pipe with 2 m length and two 90° bends
was assumed for the calculation. For some boilers a smaller chimney dimension (corresponding to the minimum
diameter) can also be used. These values are listed in brackets. The "X" marks any diameters which may not be
used.
Example: PC 50 with a 7 m chimney height and DN150 flue pipe => a chimney with 16 cm diameter is required.
Alternatively, a chimney with 15 cm diameter can be used.
No cross-sectional taper is permitted, such as a DN150 connection pipe in a chimney with a 13 cm diameter.
Clarify with the chimney sweep
A specialist or a chimney sweep must inspect the
dimensions and suitability of existing chimneys
especially before boiler installation.
Every boiler must have its own chimney
The better the boiler and the chimney are matched, the
greater the energy with which the flue gas exits the
chimney, and therefore the certainty that it will rise up
into the air.
Diameter of the flue pipe from
boiler to chimney
Chimney height above the
boiler room floor
Required chimney diameter in cm
PC 33
PC 40
PC 45
PC 50
DN 130
DN 150
6 m
X
16 (15)
X
18
a
DN 130
DN 150
7 m
X
16 (15)
X
16 (15)
DN 130
DN 150
8 m
16 (15)
15
X
15
DN 130
DN 150
9 m
15
15
16
15
DN 130
DN 150
10 m
15 (14)
15
16 (15)
15
DN 130
DN 150
11 m
14 (13)
15
15 (14)
15
DN 130
DN 150
12 m
13
15
15 (14)
15
DN 130
DN 150
13 m
13
15
14
15
DN 130
DN 150
14 m
13
15
14
15
a. For boiler outputs over 30 kW and low chimney heights, a chimney joint tilted 45° can help achieve the required draught of 5 Pa at
full load with acceptable cross-sections (a size smaller than indicated in the table).
Содержание PelletsCompact PC33
Страница 1: ...2020 07 21 EN 0000000171 V 025 2707 93113 005 PelletsCompact 33 50 kW Installation...
Страница 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33...
Страница 51: ...Installation Network connection 51...
Страница 55: ...Electrical connections Overview of circuit boards 55...
Страница 74: ...www eta co at...
Страница 75: ......
Страница 76: ...www eta co at www eta co at downloads DOWNLOAD...