General
Dismantling, disposal
7
Repair of defects
For repairs of defects carried out by the customer or by
a third party, ETA shall only bear the costs or remain
obligated by warranty if this work was approved in
writing in advance by the customer service of ETA
Heiztechnik GmbH.
No tampering with boiler safety devices
Boiler safety devices such as those mentioned below
must not be tampered with: Temperature monitoring
and control devices, safety temperature limiters, safety
valves and thermal discharge valves.
1.4
Dismantling, disposal
Dismantling
Before dismantling:
•
Stop heating. Switch off the boiler with the mains
switch and ensure that it cannot be switched back
on.
•
Disconnect the boiler (and possibly also the fuel
conveying system) from all power sources.
Dismantling is done in the reverse order of assembly.
Clean the parts and remove them in accordance with
the local regulations for workplace safety and environ-
mental protection.
Disposal
Disposal including all components must be done in an
environmentally friendly manner according to waste
disposal laws. Recycle any materials that can be
recycled.
Содержание PelletsCompact PC33
Страница 1: ...2020 07 21 EN 0000000171 V 025 2707 93113 005 PelletsCompact 33 50 kW Installation...
Страница 33: ...Buffer storage tank Connection between multiple buffer storage tanks 33...
Страница 51: ...Installation Network connection 51...
Страница 55: ...Electrical connections Overview of circuit boards 55...
Страница 74: ...www eta co at...
Страница 75: ......
Страница 76: ...www eta co at www eta co at downloads DOWNLOAD...