16
www.eta.co.at
Installation
Attaching the pellet hoses to the wall bracket
Thread the pellet suction hose from the boiler through
the corresponding opening in the cover plate from the
opposite wall.
Fig. 4-15: Threading the pellet suction hose from the boiler
At the end of the pellet hose, loosen about 4 cm from
the copper wire and bend it inwards. Slide the
connector into the pellet hose and fasten it.
Fig. 4-16: Securing the pellet suction hose
At the end of the pellet hose loosen about 4 cm from
the copper strand. Bend the copper wire inwards to
make contact between the pellet hose and connector.
Slide the pellet hose onto the connector and secure
with a hose clamp.
Mark the pellet suction hose so it can be correctly
connected to the boiler later.
Fig. 4-17: Marking the pellet suction hose
Thread the return air hose through the cover until the
hose protrudes about 100 mm from the wall bracket.
Also mark the return air hose for clear association.
Fig. 4-18: Back air hose
Содержание Mole E3
Страница 19: ...Installation 19 ...
Страница 32: ...www eta co at www eta co at downloads DOWNLOAD ...