Table of Contents
The table of contents are listed to assist you locating a desired section. We do
however strongly suggest studying every page of the instruction manual before
attempting installation.
Section 1:
Review of Specifications, Warnings, and Tools
Specifications of the Estate Swing and Components
1.1
Parts List
1.2
System Overview & Preliminary Checks
1.3
Tools Needed for Installation
1.4
Section 2:
Installation of Mounting Brackets
Manual Operation
2.1
Pull to Open Illustration
2.2
IMPORTANT: Determining SetbackPull to Open
2.3
Installation of OperatorPull to Open
2.4-5
Push to Open Illustration
2.6
IMPORTANT: Determining SetbackPush to Open
2.7
Installation of OperatorPush to Open
2.8-9
Section 3:
Gate Operator Mounting, Wiring Motors and Power
Mounting Gate Operator(s) & Finding Limits
3.1-.2
Control Box & Running Wires
3.3
Easy Wiring Under Driveway
3.4
Removing Terminal Strips for Wiring
3.5
Wiring the Operator Arms(s) (Pull & Push to Open)
3.6-7
Temporary Safety Jumpers & Dip Switch Settings
3.8
Power
3.9
Section 4:
Start Up and Operation
First Run
4.1
Determine Run Time
4.2
Operating Parameters Customization
4.3
Section 5:
Maintenance, Troubleshooting, and Accessories
Maintenance
5.1
Troubleshooting
5.2-.4
Control Board Overview
5.5-.9
Accessories
6.0
E-S 1000D Series Instruction Manual
Содержание E-S 1000D Series
Страница 4: ...Section 1 Review of Specifications Warnings and Tools E S 1000D Series Instruction Manual ...
Страница 5: ......
Страница 10: ...Section 2 Installation of Mounting Brackets E S 1000D Series Instruction Manual ...
Страница 11: ......
Страница 21: ...Section 3 Gate Operator Mounting Wiring Motors Power E S 1000D Series Instruction Manual ...
Страница 22: ......
Страница 32: ...Section 4 Start Up Operation E S 1000D Series Instruction Manual ...
Страница 33: ......
Страница 37: ...Section 5 Maintenance Troubleshooting Accessories E S 1000D Series Instruction Manual ...
Страница 38: ......