Page 29 of 55
Vertical Installations
Always maintain a 1” clearance around the vent pipe (vertical) and 1” clearance horizontal, when passing
through ceilings, walls, roofs, enclosures, attic rafter or any combustible surfaces.
NOTE
DO NOT PACK AIR SPACES WITH INSULATION
NE PAS PACK ESPACES D'AIR AVEC ISOLATION
When passing through a flat ceiling
in
stall a Box/Wall thimble. Cut a 9” square hole and frame as shown in
the diagram below.
NOTE
ALWAYS CHECK YOUR LOCAL CODES BEFORE INSTALLING VENTING. CLEARANCES ETC,
MAY VARY FROM STATE TO STATE (PROVINCE TO PROVINCE).
TOUJOURS vérifier les codes locaux avant l'installation VENTILATION. ETC DÉGAGEMENTS, peut
varier d'ÉTAT (PROVINCE).
NOTE
CONSULT DURAVENT PARTS LIST OR INCA METAL CUTTING’S FIREPLACE MANUFACTURING
PARTS LIST FOR PART NUMBERS.
FOYER Duravent CONSULT LISTE DES PIÈCES OU COUPE METAL INCA de fabrication LISTE
DES PIÈCES DE RÉFÉRENCE.
See section 3.3.4 Venting for instructions on how to connect Security or Dura-vent
venting.
9” x 9” opening
Содержание ESS45
Страница 25: ...Page 25 of 55 34 20 A A B B Example Where A A Vertical 2 And B B Horizontal 5 15 MINIMUM 15 MAXIMUM...
Страница 48: ...Page 48 of 55 8 0 LABEL INFORMATION...
Страница 50: ...Page 50 of 55 APPENDIX A AMERICAN FLAME VALVE INFORMATION...
Страница 51: ...Page 51 of 55 APPENDIX A Continued...