
PCB with Connectors
2. PCB with Connectors
2.1 PCB Top Layer View with Connectors and LEDs
Figure 2:
PCB top view
NOTICE
Read chapter “Hardware Installation” on page 16 before starting the installation of the
hardware!
See also page 25 and following for signal assignments of the connectors.
The JTAG connectors and the Debug-interface connector have to be connected on the PCB
bottom side of XMC-CPU/T10 (see Figure 3 for the position of the connectors and pins).
XMC-CPU/T10
Hardware Manual • Doc. No.: V.2030.21 / Rev. 1.2
Page 11 of 41