Instalacion_10
v1.2.fm -
10/12/07
VULCAN hydraulic actuator
63
INSTALLATION
-
Procedure
Position the front and rear supports
Mount the swivel joint and the fork
1
Attach the front (1) and rear (2) supports, keeping strictly
to the dimensions shown in the previous section.
)
The installer should choose the support attachment
system (welding, screwing, molding, etc) in accordance
with the composition of the material to which the
supports are attached (metal, concrete, etc).
)
Attach the supports on sufficiently robust
structural elements.
O
IT IS VERY IMPORTANT TO RESPECT THE
DIMENSIONS: If the dimensions are not respected,
the spindle will not make the whole travel,
meaning the absorption system will not work.
2
Weld the reinforcements (3) and (4) to the supports
(1) and (2).
O
Carry out the welding with the actuator
withdrawn and at a distance. If not, the spindle
may become damaged from welding splatter,
which could lead to failures and oil leaks.
1
Introduce the nut (1) in the swivel joint (2).
2
Thread the swivel joint-nut set on the spindle (3).
3
Position the fork (4) in its housing in the rear top (5).
4
Introduce the horizontal pin (6), crossing the fork
and the top.
)
Horizontal pin:
ø
= 10mm, L = 57.2mm
5
Secure the pin using the safety washers (7).
6
Position the caps (8) to close the housing.