Instalacion_93 v04.fm -
13
/6/18
INSTALLATION
22
Installation Guide
VIVO-I103:
G2
G1
G3
VIVO-I103
SK130-SK135
P93U
DS1
DS4
Operator parts (SK130, SK135):
D:
Unlock switch
K:
Thermal cut-out
FCA:
Opening limit switch
FCC:
Closing limit switch
FCS:
Additional limit switch (to be used in
accordance with customer or installation
requirements)
Control board parts (VIVO-I103):
DS1:
LED SNG1 (FCA)
DS4:
LED SNG2 (FCC)
SW1:
General circuit breaker
Operator connections SK130, SK135:
1
Opening limit switch (FCA)
2
Limit switches common
3
Closing limit switch (FCC)
4-5
Additional limit switch (FCS)
6-7
Thermal cut-out / unlock switch
U, V, W:
Motor connections
PE:
Earth connection
Check turning direction using UP and DOWN in
parameter
C101
. If it is not correct, select
C102
(see the control board instructions for further
information).
THREE-PHASE OPERATORS (SK130E, SK135E, SK130C and SK135C) with VIVO-I103 board
Change the SK130 and SK135 settings
,
s w i t c h i n g f r o m 3 x 4 0 0 V t o 3 x 2 3 0 V ,
connecting the cables as follows:
U
:
red
V
:
blue
W
: white
U
:
red + brown
V
:
blue + green
W
: white + black
Select options
C303
(up-and-over
operation) and
C702
(limit switches).