Instalacion_
95.fm -
4/6/10
RINO operator for sliding gates
55
INSTALLATION
Mount the magnetic limit switches
1
Move the gate manually to the opening position,
and position the opening magnet (1) with the
respective magnet-holder plate (2).
In the gate open position, the magnet (1) must
be opposite the magnetic opening limit switch
(reed) (3).
The distance between the magnets and the
operator frame must be at least 5 mm.
2
Move the gate manually to the closing position, and
position the closing magnet (4) with the respective
magnet-holder plate (5).
In the gate closed position, the magnet (4) must
be opposite the magnetic closing limit switch (reed)
(6).
The distance between the magnets and the
operator frame must be at least 5 mm.
3
Lock the operator using the handle (7).
RINO_EN.book Page 55 Thursday, June 10, 2010 5:21 PM
Содержание RINO
Страница 2: ...RINO book book Page 2 Friday June 11 2010 11 00 AM...
Страница 26: ...Actualizado 4 6 10 22 RINO_ES book Page 22 Friday June 11 2010 9 59 AM...
Страница 70: ...Updated 4 6 10 66 RINO_EN book Page 66 Thursday June 10 2010 5 21 PM...
Страница 115: ...RINO book book Page 17 Friday June 11 2010 11 00 AM...