Instalacion_
95.fm -
4/6/10
RINO operator for sliding gates
53
INSTALLATION
3
INSTALLING THE OPERATOR
Assembly positions and levels
Procedure
Secure the base plate to the floor
AB
1
Position the ducts (1) for electrical installation.
2
Secure the base plate (2) to the floor, taking into
account the assembly levels.
Introduce the anchor bolts in the base when the
cement is still wet.
3
Level the base plate (2).
1
Gate
2
Rack
3
Base plate
4
Drive pinion
5
Operator
6
Magnet holder plates
7
Opening limit switch magnet
8
Closing limit switch magnet
RINO_EN.book Page 53 Thursday, June 10, 2010 5:21 PM
Содержание RINO
Страница 2: ...RINO book book Page 2 Friday June 11 2010 11 00 AM...
Страница 26: ...Actualizado 4 6 10 22 RINO_ES book Page 22 Friday June 11 2010 9 59 AM...
Страница 70: ...Updated 4 6 10 66 RINO_EN book Page 66 Thursday June 10 2010 5 21 PM...
Страница 115: ...RINO book book Page 17 Friday June 11 2010 11 00 AM...