Instalacion_68
v0.0.fm -
9/4/16
ARES electro-mechanical operator
31
INSTALLATION
5
OPERATOR INSTALLATION
Assembly positions and levels
Short operator (run 300mm), inward opening
A (cm) B (cm)
C (º)
140
140
95
120
160
120
Long operator (run 400mm), inward opening
A (cm) B (cm)
C (º)
190
190
95
135
185
120
Short operator (run 300mm), outward opening
A (cm) B (cm)
C (º)
140
140
95
120
160
120
Long operator (run 400mm), outward opening
A (cm) B (cm)
C (º)
190
190
95
135
185
120
Levels A and B determine the opening angle C.
Содержание ARES AE3324D
Страница 2: ......
Страница 4: ......
Страница 16: ...Actualizado 8 3 16 MANTENIMIENTO Y DIAGN STICO DE AVER AS 12 Manual de instalaci n...
Страница 28: ...Mis jour 9 4 16 MAINTENANCE ET DIAGNOSTIC DE PANNES 24 Manuel d installation...
Страница 40: ...Updated 9 4 16 MAINTENANCE AND DIAGNOSIS OF FAILURES 36 Installation Manual...
Страница 52: ...Actualizado 9 4 16 MANUTEN O E DIAGN STICO DE AVARIAS 48 Manual de instala o...