Instalacion_68 v0.0.fm
- 9/4/16
INSTALLATION
30
Installation Manual
3
UNPACKING
Fig. 1
Content and spare parts
4
MANUAL OPERATION
In the event of need, the gate may be operated manually, acting first on the unlocking mechanism.
Discard the packaging safely
and in an environmentally
friendly manner.
Check the content of the
packages. Should it be noticed
that a piece is missing or
deteriorated, contact the nearest
technical service.
1
Operator
2
Capacitor
3
Wall support
4
Gate support
5
Shafts
6
Shaft caps
7
Unlocking key
8
Unlocking orifice cap
3
Unlocking (manual operation)
1
Introduce the key (2) in the unlocking screw (1).
2
Turn the unlocking key 90º in the direction
of the arrow, until it reaches the stopper.
The operator is unlocked and the gate can now
be moved manually.
3
Locking (motorised operation)
1
Introduce the key (2) in the unlocking screw (1).
2
Turn the unlocking key 90º in the opposite
direction to the arrow, until it reaches the
stopper. The operator is locked (the gate is
interlocked).
Содержание ARES AE3324D
Страница 2: ......
Страница 4: ......
Страница 16: ...Actualizado 8 3 16 MANTENIMIENTO Y DIAGN STICO DE AVER AS 12 Manual de instalaci n...
Страница 28: ...Mis jour 9 4 16 MAINTENANCE ET DIAGNOSTIC DE PANNES 24 Manuel d installation...
Страница 40: ...Updated 9 4 16 MAINTENANCE AND DIAGNOSIS OF FAILURES 36 Installation Manual...
Страница 52: ...Actualizado 9 4 16 MANUTEN O E DIAGN STICO DE AVARIAS 48 Manual de instala o...